My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 3:43:26 PM
Creation date
6/2/2022 3:37:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC Strategic Expenditure Plan 2022 Update │ Chapter 2: Project Description <br />Draft Final Report │ April 29, 2022 4 <br /> <br />• B-8 Camino Tassajara/Tassajara Road Widening Project (East of Blackhawk Drive to North <br />Dublin Ranch Drive) <br />• B-9 Danville Boulevard/Stone Valley Road I-680 Interchange Improvements <br />o Removed from project list and no longer considered for funding <br />• B-10 I-680 Southbound HOV Lane Gap Closure (North Main Street to Rudgear Road) <br />o Completed, therefore not considered for further funding <br />• B-11a I-680 HOV Direct Access Ramps <br />o Removed from project list and no longer considered for funding <br />• B-11b I-680 Transit Corridor Improvements <br />o Project incorporated into Project C-10 Innovate 680 and removed from project list and no <br />longer considered for funding <br /> <br />LIST C <br />• C-1 Tesla Road Safety Improvements <br />• C-2 Norris Canyon Road Safety Improvement <br />• C-3 Dublin Boulevard – North Canyon Parkway Extension <br />• C-4 Vasco Road at Dalton Avenue Intersection Improvements <br />• C-5 El Charro Road Widening <br />• C-6 Sunol/680 Interchange Improvements <br />• C-7 I-680 Express Lanes - Hwy 84 to Alcosta <br />• C-8 Santa Rita/I-580 Interchange <br />• C-9 Stoneridge/I-680 Interchange <br />• C-10 Innovate 680 <br />• C-11a Iron Horse Trail Bicycle-Pedestrian Overcrossing – Bollinger Canyon Road <br />• C-11b Iron Horse Trail Bicycle-Pedestrian Overcrossing – Crow Canyon Road <br />• C-11c Iron Horse Trail Crossing at Dublin Boulevard <br />• C-11d Iron Horse Trail – Livermore <br />• C-11e Iron Horse Trail to Shadow Cliffs Connection <br />• C-11f Iron Horse Trail Connection Improvements at Santa Rita Road <br />• C-11g Iron Horse Trail Bicycle-Pedestrian Overcrossing – Sycamore Valley Road <br />• C-11h Iron Horse Trail System-wide improvements <br />• C-12 Hacienda/I-580 Interchange Improvements <br />• C-13 Fallon/El Charro Interchange Improvements <br />• C-14 Valley Link Rail (Phase 1) <br />• C-15 Technology Enhancements <br />• C-16 I-680 Express Bus Service <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.