My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Si nificant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> b) Have sufficient water supplies available <br /> to serve the project and reasonably <br /> foreseeable future development during ❑ ❑ El <br /> normal,dry,and multiple dry years? <br /> c) Result in a determination by the <br /> wastewater treatment provider, which <br /> serves or may serve the project that it ❑ ❑ ❑ <br /> El <br /> has adequate capacity to serve the <br /> project's projected demand in addition <br /> to the provider's existing commitments? <br /> d) Generate solid waste in excess of State <br /> or local standards,or in excess of the <br /> capacity of local infrastructure,or ❑ ❑ ® ❑ <br /> otherwise impair the attainment of solid <br /> waste reduction goals? <br /> e) Comply with federal,state,and local <br /> management and reduction statutes ❑ ❑ ❑ <br /> and regulations related to solid waste? <br /> Setting <br /> The project site would be entirely within the existing Augustin Bernal Community Park that is owned and <br /> maintained by the City of Pleasanton. <br /> Impact Discussion <br /> a) Would the project require or result in the relocation or construction of new or expanded water, <br /> wastewater treatment, or storm water drainage, electric power, natural gas, or <br /> telecommunications facilities, the construction or relocation of which could cause significant <br /> environmental effects? <br /> The proposed project would construct a mountain bike trail and does not include any new facilities <br /> that would require water supply, wastewater collection and treatment, energy, or <br /> telecommunication. As discussed in Section 3.16(a), the project would not directly or indirectly <br /> increase the City's population and does not include any non-recreational land uses. Thus the <br /> project would not result in an increase in utility service demand by City residences or businesses. <br /> As discussed in Section 3.10(b),the project would not result in an increase in stormwater drainage. <br /> The project would have no impact associated with requiring new, relocated, or expanded utility <br /> service facilities and infrastructure. <br /> 12956 <br /> DUDEK 83 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.