Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> No known tribal cultural resources that are listed or eligible for listing in the California <br /> Register of Historical Resources, or in a local register of historical resources as defined in <br /> PRC Section 5O2O.1(k) have been identified through the AB 52 notification process or the <br /> cultural resources investigation conducted on the project site. However, as discussed in <br /> Section 3.5(b),there is a potential to encounter cultural resources, includingtribal cultural <br /> resources, during project construction. Evaluation and protection measures for potential <br /> discoveries of tribal cultural resources are identified in MM-CUL-1.With implementation of <br /> MM-CUL-1, impacts to tribal cultural resources would be less than significant. Therefore, <br /> impacts would be less than significant with mitigation incorporated. <br /> ii) A resource determined by the lead agency, in its discretion and supported by substantial <br /> evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public <br /> Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of <br /> Public Resource Code Section 5024.1, the lead agency shall consider the significance of <br /> the resource to a California Native American tribe? <br /> No tribal cultural resources,as defined in PRC Section 21074, have been identified within <br /> the project site or in its immediate vicinity to date. It is possible that ground disturbing <br /> activities associated with the project, such as grading, could uncover previously <br /> undiscovered tribal cultural resources. Implementation of MM-CUL-1 would ensure that <br /> appropriate protocol and BMPs are followed to ensure appropriate evaluation and <br /> treatment of any tribal cultural resources that may be uncovered during construction <br /> activities and that project impacts to tribal cultural resources would be less than <br /> significant.Therefore, impacts would be less than significant with mitigation incorporated. <br /> Mitigation Measures <br /> Refer to Section 3.5 for MM-CUL-1. <br /> 3.19 Utilities and Service Systems <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> # � Incorporated Impact No Impact <br /> XIX.UTILITIES AND SERVICE SYSTEMS -Would the project: <br /> a) Require or result in the relocation or <br /> construction of new or expanded water, <br /> wastewater treatment,or storm water <br /> drainage, electric power, natural gas,or ❑ ❑ ❑ <br /> telecommunications facilities,the <br /> construction or relocation of which could <br /> cause significant environmental effects? <br /> 12956 <br /> DUDEK 82 April 2022 <br />