My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:53:33 PM
Creation date
2/2/2023 1:52:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> specific additional mitigation measures for the project would be speculative and cannot be <br /> identified at this time. With respect to future GHG targets under SB 32 and EO S-3-05, CARB has <br /> also made clear its legal interpretation that it has the requisite authority to adopt whatever <br /> regulations are necessary,beyond the AB 32 horizon year of 2020,to meet SB 32's 40%reduction <br /> target by 2030 and EO S-3-05's 80%reduction target by 2050;this legal interpretation by an expert <br /> agency provides evidence that future regulations will be adopted to continue the state on its <br /> trajectory toward meeting these future GHG targets. <br /> Based on the above considerations, the project would have no impact due to conflicts with an <br /> applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> 3.9 Hazards and Hazardous Materials <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> IX. HAZARDS AND HAZARDOUS MATERIALS -Would the project: <br /> a) Create a significant hazard to the public <br /> or the environment through the routine ❑ ❑ ❑ ❑ <br /> transport, use,or disposal of hazardous <br /> materials? <br /> b) Create a significant hazard to the public <br /> or the environment through reasonably <br /> foreseeable upset and accident ❑ ® ❑ ❑ <br /> conditions involving the release of <br /> hazardous materials into the <br /> environment? <br /> c) Emit hazardous emissions or handle <br /> hazardous or acutely hazardous <br /> materials,substances,or waste within ❑ ❑ ❑ <br /> one-quarter mile of an existing or <br /> proposed school? <br /> d) Be located on a site that is included on <br /> a list of hazardous materials sites <br /> compiled pursuant to Government Code ❑ ❑ ❑ <br /> Section 65962.5 and,as a result,would <br /> it create a significant hazard to the <br /> public or the environment? <br /> 12956 <br /> DUDEK 60 April 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.