Laserfiche WebLink
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br /> Less Than <br /> Significant <br /> Potentially Impact With Less Than <br /> Significant Mitigation Significant <br /> Impact Incorporated Impact No Impact <br /> e) For a project located within an airport <br /> land use plan or,where such a plan has <br /> not been adopted,within two miles of a <br /> public airport or public use airport, ❑ ❑ ❑ <br /> would the project result in a safety <br /> hazard or excessive noise for people <br /> residing or working in the project area? <br /> f) Impair implementation of or physically <br /> interfere with an adopted emergency El ❑ ❑ <br /> response plan or emergency evacuation <br /> plan? <br /> g) Expose people or structures,either <br /> directly or indirectly,to a significant risk ❑ <br /> of loss, injury or death involving wildland <br /> fires? <br /> Setting <br /> Hazardous materials stored and used in the area surrounding the project area would likely be associated <br /> with common materials used in commercial and recreational activities, such as paints, cleaning solvents, <br /> bonding agents, and small quantity petroleum fuels and lubricants, as well as herbicides and pesticides <br /> used for common weed and pest control applications. A search of the State Geotracker and Envirostor <br /> databases determined that no active hazardous materials cleanup sites are located in proximity of the <br /> project site. Livermore Pleasanton Fire Department provides emergency response to the project site. <br /> Impact Discussion <br /> a) Would the project create a significant hazard to the public or the environment through the routine <br /> transport, use, or disposal of hazardous materials? <br /> Construction of the project would involve the use of common hazardous materials used in <br /> construction, including petroleum-based fuels, hydraulic fluids,and lubricants used in vehicles and <br /> equipment. Large quantities of these materials would not be stored at or transported to the <br /> construction site. All construction waste materials would be disposed of in compliance with state <br /> and federal hazardous waste requirements and at appropriate facilities.Construction would comply <br /> with the requirements for storage,spill prevention and response and reporting procedures,and by <br /> implementing erosion control and pollution prevention measures included in the trail design plans <br /> (see Section 3.7, Geology and Soils, including MM-GEO-1; Section 3.10, Hydrology and Water <br /> Quality; and Appendix A). Additionally, MM-HAZ-1 requires specific measures for spill prevention <br /> and containment of hazardous materials on the project site during construction. <br /> 12956 <br /> DUDEK 61 April 2022 <br />