My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:15 PM
Creation date
2/16/2023 1:15:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B <br />TABLE 6-1 <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br />Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br />A.Aesthetics <br />Mitigation Measure 4.141:The City shall require that site plans 7 I Project applicant will prepare City of Pleasanton Verify inclusion of view Prior to PUD Verified by <br />for the proposed Site 7 residential development to incorporate I <br />PUD plans that adhere to all City Coot corridors from Valley approval. <br />view ccnidors through the site which maintain views of the I specifications in this Avenue across site to the <br />ridgelines to the west from Valley Avenue. <br />I i measure. ridgelinee to the west on the Date: <br />I site plans. <br />B.Air Duality <br />Mitigation Measure 4.61:Prior to the issuance of a grading or All Project applicant shall hire Community Approve air quality Prior to issuance Venfred by: <br />building permit whichever is sooner.the project applicant for a an air quality consultant Development consultant selection. of grading or <br />potential site for rezoning shall stmt an air quality construction approved by the City of Department Review verification from air building permit. <br />plan detailing the proposed air quality construction measures Pleasanton who will prepare quality consultant.Verify whichever is Date: <br />related to the project such as construction phasing,construction a Construction Air Pollutant inclusion of dust control sooner,inspect • <br />equipment,and dust control measures,and such plan shall be Control Plan that adheres to measures in applicable during <br />approved by the Director of Community Development.Air quality <br />all specifications in this construction plans and construction. <br />construction measures shall include Basic Constriction measure and will verity in specifications',field <br />Mitigation Measures(BAADMD,May 2011)and,where writing that the plan adheres inspections during <br />construction-related emissions would exceed the applicable to all of BAAOMD's air construction. <br />thresholds,Additional Construction Mitigation Measures ! quality guidance which is <br />BAAOMD.May 2011)shall be instituted.The air quality <br />applicable to the prated. <br />construction plan shall be included on all grading,utility, <br />building,landscaping,and improvement plans during all phases <br />of construction,access roads,parking areas and staging areas <br />at construction sites. <br />Mitigation Measure 4.164:Reduce Exposure to TACa.On All Project applicant will hire a Community Community Development Community Verified by: <br />project sites where screening thresholds are exceeded,the qualified air quality consult Development Dept-Review and approve Development <br />following measures shall be implemented for development on all to prepare a HRA. Department TAC reduction measures. Department- <br />Me potential sites for rezoning to reduce exposure to TACs and Community Development Approve Date: <br />improve indoor and outdoor air quality:Department-Review and consultant <br />Project applicant will approve selection of air selection prior to <br />Indoor Air Quality-In <br />measures <br />ice with the recommendations <br />ito <br />o/ <br />prepare plans that adhere to quality consultant.Verify PUD approval. <br />BAAOMD,appropoate measu shall be incorporated into <br />all spedfications In MM inclusion of the approved Verity inclusion of <br />building design In rimer to reduce the potential M1eaIM risk due to <br />measure. TAC reduction measures in approved <br />exposure of sensitive receptors to TAGS. i the construction plans. measures poor to <br />Proj ect applicants shall retain a qualified air quality consultant to j Verify implementation prior the Issuance of <br />trepans health asaccordanceriskassessment(HRA)in accordance with the <br />to occupancy. building permits. <br />e Inspect site <br />BAADMD requirements to determine the exposure of project during <br />reabenWoccupants/users to air pollutants prior to PUD construction to <br />approval.The HRA shall be submitted to the Community ensure <br />Conn'Plan Am dmenl and Ramming. 6-3 ESA/21001G <br />eel supgwnenrl Enimmmmwul Open Riper Decreer 2011
The URL can be used to link to this page
Your browser does not support the video tag.