Laserfiche WebLink
A - 1 City of Pleasanton Operating Budget • FY 2023/24 - FY 2024/25 <br />APPENDIX A <br />The City of Pleasanton prepares a four-year Capital Improvement Plan (CIP) document that is separate <br />from the Operating Budget document, although the two are closely linked. The CIP, as distinguished from <br />the Operating Budget, is used as a planning tool for the City to identify the capital improvement needs of <br />the City and align those needs with the appropriate timing and financing in a way that assures the most <br />responsible and efficient use of resources. City Council appropriates funds for the first two years of the <br />four-year CIP. The four-year CIP is reviewed bi-annually to enable the City Council to reassess projects in <br />the program and allocate funds. <br />A capital project typically involves the purchase or construction of major fixed assets such as land, <br />buildings and any permanent improvement including additions, replacements and major alterations <br />having a long life expectancy. Additionally, capital projects may apply to: 1) expenditures which take <br />place over two or more years and require continuing appropriations beyond a single fiscal year; 2) <br />systematic acquisitions over an extended period of time or 3) scheduled replacement or maintenance of <br />specific elements of physical assets. Generally, only those items costing $50,000 or more are considered <br />as capital projects. For informational purposes, capital projects are also referred to as capital facilities, <br />CIP projects and capital improvement projects. <br />For more information on the City’s CIP, please refer to the FY 2023/24 – 2026/27 Capital Improvement <br />Program located on the City’s website: www.cityofpleasantonca.gov. The information provided in this <br />section is from the original adopted FY 2023/24 – 2026/27 CIP. <br />Capital Improvement Program Summary <br />The FY 2023/24 – 2026/27 CIP includes 43 City projects totaling approximately $78.7 million. The chart <br />below shows the FY 2023/24 and FY 2024/24 Capital Budget by CIP category. <br /> <br />Capital Improvement Program Overview <br />CIP Program Category FY 2023/24 FY 2024/25 Totals <br />Facilities $3,600,000 $200,000 $3,800,000 <br />Parks 4,231,012 1,300,000 5,531,012 <br />Sewer 2,500,000 1,500,000 4,000,000 <br />Storm Drain 475,000 1,215,000 1,690,000 <br />Transportation & Streets 18,177,497 8,540,000 26,717,497 <br />Water 1,050,000 1,050,000 2,100,000 <br />Miscellaneous 2,175,000 375,000 2,550,000 <br />Total CIP (1)$32,208,509 $14,180,000 $46,388,509 <br />(1)Excluding fund transfers and other operating expenditures.