Laserfiche WebLink
►/ MARK TO#6—Sunol Boulevard Line F-7 Water Improvements <br /> THOMAS City of Pleasanton <br /> TASK 1. PROJECT MANAGEMENT AND COORDINATION <br /> Task 1.1. Project Management <br /> Mark Thomas will provide ongoing general project management for this task order, including coordinating <br /> activities and submittals. General project management will also include organizing and maintaining files and <br /> records to track correspondence, contractual matters, data requests, transmittals, and other pertinent data. <br /> Mark Thomas will prepare monthly invoices for this task. A brief progress report(typically one page long) will also <br /> be prepared, detailing the summary of work that has been accomplished in the previous month and anticipated <br /> work for the next month. It is anticipated that this scope of work will be completed in 6 months. <br /> Task 1.2. Meetings <br /> Mark Thomas will attend up to six(6)coordination meetings with the City and other stakeholders as directed by <br /> the City. These include the meetings at the end of each design phase. This task includes preparation of agendas, <br /> meeting minutes and a log of action items as needed. <br /> TASK 1 DEL/VERA BLES <br /> • Monthly invoices and progress reports (up to 6) <br /> • Coordination Meetings(up to 6) <br /> TASK 2. PRELIMINARY ENGINEERING <br /> Mark Thomas will perform preliminary engineering tasks including site visits, attend meetings, and limited field <br /> utility locating. <br /> Task 2.1. Site Visits <br /> Mark Thomas will visit the site to determine field conditions and identify potential conflicts. Up to two(2) site <br /> visits are anticipated and notes will be prepared and distributed to the City. <br /> Task 2.2. Potholing <br /> Mark Thomas will arrange limited potholing for the purpose of identifying underground utilities that are <br /> determined to be critical to be resolved ahead of the construction process. These potholes are not intended to <br /> comprehensively identify all utilities,as these items are intentionally being located during construction. Up to ten <br /> (10) potholes are anticipated at a cost of$3,500 per pothole. <br /> TASK2 DEL/VERA BLES <br /> • Site Visits with notes(up to 2) <br /> • Pothole data sheets (up to 10 potholes) <br />