My WebLink
|
Help
|
About
|
Sign Out
RANEY PLANNING & MANAGEMENT, INC. (#2024409)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
R
>
RANEY PLANNING & MANAGEMENT, INC. (#2024409)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:38:41 PM
Creation date
12/11/2023 1:25:53 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
RANEY PLANNING & MANAGEMENT, INC.
Contract Record Series
704-05
Munis Contract #
2024409
Contract Expiration
4/30/2024
NOTES
PSA ENTERED INTO TM; REINBURSEMENT AGREEMENT NOT ENTERED, BUT ROUTED FOR SIGNATURES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3 <br /> <br />Proposal <br />• Biological Resources Analysis Memorandum (BRA) <br />• Arborist Report <br />• Geotechnical Investigation <br />• Environmental Noise Study <br />• Phase I Environmental Site Assessment (Phase I ESA) <br />• Transportation Assessment <br />Task 2: Preparation of Comprehensive Project Description <br />Drawing on the Project Description provided by the applicant team and using the information obtained <br />during project initiation, FCS will prepare a comprehensive Project Description for the city ’s review and <br />approval. Pursuant to CEQA Guidelines Section 15124, the Project Description will identify the project <br />location, describe the project characteristics, and identify necessary approvals. The Project Description <br />will use graphics and tables to clearly convey relevant information to the reviewer and will include all of <br />the information required to define the proposed project for the purposes of CEQA, including a clear <br />explanation of the development components of the proposed project, a description of the construction <br />and operational activities associated with the proposed project, and clearly illustrated project <br />components displayed in exhibits based on Geographic Information System (GIS) data. <br />The approved Project Description will form the basis for evaluating the proposed project in the CEQA <br />document. The draft Project Description will be submitted to the City for review and approval prior to <br />the development of the Administrative Draft IS/Consistency Checklist. It is assumed that the city will <br />coordinate review with the applicant team and will provide one set of consolidated, vetted comments <br />(with tracked changes in the Word document) on the draft Project Description and a complete RFI to FCS <br />within 2 weeks of submittal. Changes to the Project Description made after the city has issued their <br />approval may require a Change Order and may extend the project schedule. <br />Deliverable: <br />• Electronic copy (via email in Microsoft Word and PDF) of the Project Description to the city <br />Task 3: Peer Review Applicant-Provided Technical Studies <br />FCS will peer review the applicant-provided technical studies, listed below, to verify their adequacy for <br />purposes of CEQA and to ensure consistency among technical reports and accuracy in the representation <br />of project-related information. If FCS deems that any technical studies are insufficient, FCS will provide <br />the City with a memorandum outlining the inadequacies/inaccuracies of said documents. The applicant <br />team will be responsible for submitting the necessary revised technical study back to the City and FCS <br />prior to the preparation of the Administrative Draft IS/Consistency Checklist. This Scope assumes that <br />FCS will peer review the following technical studies: <br />• Air Quality Technical Report <br />• Greenhouse Gas Emission Compliance Checklist <br />• Biological Resources Analysis Memorandum (BRA) <br />DocuSign Envelope ID: FE1B6497-6527-4DEE-8F28-BF9999E929AA
The URL can be used to link to this page
Your browser does not support the video tag.