My WebLink
|
Help
|
About
|
Sign Out
RANEY PLANNING & MANAGEMENT, INC. (#2024409)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
R
>
RANEY PLANNING & MANAGEMENT, INC. (#2024409)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:38:41 PM
Creation date
12/11/2023 1:25:53 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
RANEY PLANNING & MANAGEMENT, INC.
Contract Record Series
704-05
Munis Contract #
2024409
Contract Expiration
4/30/2024
NOTES
PSA ENTERED INTO TM; REINBURSEMENT AGREEMENT NOT ENTERED, BUT ROUTED FOR SIGNATURES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 <br /> <br />Proposal <br />Energy Analysis <br />FCS will provide an analysis of energy impacts consistent with the CEQA Guidelines Appendix F Energy <br />analysis requirements. The energy analysis will review relevant federal, State, and local regulations, and <br />policies, including consistency with the CAP 2.0, to determine whether the proposed project would <br />conflict with or obstruct any required policies or mandatory measures related to energy conservation. <br />This Scope assumes no quantification of energy usage would be necessary. <br />Task 5: Preparation of Administrative Draft IS/Consistency Checklist <br />The format will include separate sections for discussion of each CEQA Guidelines Appendix G <br />Environmental Checklist impact category, and it will be adequately supported by exhibits (including color <br />GIS mapping, as appropriate). For checklists questions that do not require individual analysis given <br />project characteristics (e.g., impacts of the proposed project on agriculture and forestry resources) FCS <br />will combine the analysis, as appropriate. The Administrative Draft IS/Consistency Checklist will evaluate <br />project impacts against each question on the Appendix G Environmental Checklist and determine <br />whether a potentially significant impact could occur that requires mitigation or if impacts would be less <br />than significant and would not require mitigation. <br />The following issues will be evaluated in the Administrative Draft IS/Checklist: <br />• Aesthetics <br />• Agriculture and Forestry Resources <br />• Air Quality <br />• Biological Resources <br />• Cultural Resources <br />• Energy <br />• Geology and Soils <br />• GHG Emissions <br />• Hazards and Hazardous Materials <br />• Hydrology and Water Quality <br />• Land Use and Planning <br />• Mineral Resources <br />• Noise <br />• Population and Housing <br />• Public Services <br />• Recreation <br />• Transportation <br />• Tribal Cultural Resources <br />• Utilities and Service Systems <br />• Wildfire <br />• Mandatory Findings of Significance <br />Deliverable: <br />• Electronic copy (via Dropbox) of the Administrative Draft IS/Consistency Checklist in Microsoft <br />Word and PDF formats to the city <br />Task 6: Preparation of Screencheck Draft IS/Consistency Checklist <br />This Scope assumes the city will coordinate review with the applicant team and will provide one set of <br />consolidated, vetted comments (with tracked changes in the Word document) on the Administrative <br />Draft IS/Consistency Checklist. Once FCS receives these comments, FCS will complete revisions and <br />prepare a Screencheck Draft IS/Consistency Checklist for review. <br />DocuSign Envelope ID: FE1B6497-6527-4DEE-8F28-BF9999E929AA
The URL can be used to link to this page
Your browser does not support the video tag.