My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
121923 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 6:21:19 PM
Creation date
12/18/2023 6:19:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/19/2023
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br />DISCUSSION <br />Tract 8259 constructed Arches Way, Chesapeake Bay Court, and Salt River Bay Court, all <br />public roads that extend east from Valley Trails Drive. The roads include City-operated public <br />utilities (water, sanitary sewer, and storm drainage) as well as sidewalks and streetlights. The <br />subdivider also constructed a public restroom that adjoins Valley Trails Park. <br /> <br />The Sycamore Homeowners Association will maintain the stormwater treatment facilities, as <br />well as the landscaping that surrounds the north, west, and south sides of the public restroom. <br />The east side of the restroom adjoins Valley Trails Park and will be maintained by the City as <br />part of the park improvements. <br /> <br />Acceptance of the constructed public improvements will add to the City’s inventory of <br />infrastructure requiring long-term maintenance. Specifically, the following public improvements <br />were added: <br /> <br />Description Quantity Unit Value (nearest thousand) <br />Roadway pavement 44,094 Square feet $221,000 <br />Street signs & markings 1 Lump sum $5,000 <br />Curb & gutter 2,810 Lineal feet $86,000 <br />Sidewalk 13,290 Square feet $67,000 <br />Driveways 37 Each $79,000 <br />Curb ramps 4 Each $8,000 <br />Storm drain pipe 2,190 Lineal feet $157,000 <br />Storm drain manholes 11 Each $65,000 <br />Storm drain inlets 15 Each $45,000 <br />Street lights 14 Each $53,000 <br />Subtotal (General) $786,000 <br /> <br />Sewer manholes 10 Each $50,000 <br />Sewer pipe 1,182 Lineal feet $59,000 <br />Water pipe 1,195 Lineal feet $90,000 <br />Fire hydrants 3 Each $20,000 <br />Air release valves 2 Each $3,000 <br />Water meters 38 Each $76,000 <br />Subtotal (Enterprise) $298,000 <br /> <br />Total $1,084,000 <br /> <br />EQUITY AND SUSTAINABILITY <br />Not applicable, as this item is an administrative matter of City business. <br /> <br />OUTREACH <br />Prior to the approval of this subdivision, the development application was subject to public <br />hearings with the Planning Commission and the City Council. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Not applicable, as this item is an administrative matter of City business. <br />Page 217 of 270
The URL can be used to link to this page
Your browser does not support the video tag.