Laserfiche WebLink
Page 5 of 11 <br /> <br /> <br />Miscellaneous CIP Projects <br />In FY 2022/23, the design was completed and construction began for the Val Vista Underdrain <br />project that will provide a permanent solution to ensure compliance with the Regional Water <br />Quality Board regulations, routing recycled water underdrainage to local sewers instead of into <br />the storm drain system. The design for the short-term ACE train parking solution was <br />completed. The Valley Ave Soundwall Replacement project entered the design phase and will <br />reconstruct and stabilize the failing soundwalls along Valley Avenue. <br /> <br />Table 6 summarizes the full list of Miscellaneous CIP projects with actual expenditures to the <br />amended budget for FY 2022/23, along with recommended carryforwards. <br /> <br />Table 6 – Miscellaneous CIP Projects <br />Page 244 of 270