My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
020624 REGULAR
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 9:38:50 AM
Creation date
2/6/2024 9:33:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAFTELIS 1 <br /> <br /> <br />Scope of Work <br />Note: We assumed that staff meetings are virtual. <br /> <br />Task 1: Project Management, Kick-Off Meeting, Data Collection and <br />QA/QC <br />This task includes time for client correspondence, billing, general project scheduling, and time to prepare meeting <br />minutes. We propose gathering the required data and starting the financial model before the kick-off meeting. Therefore, <br />we will make the most of the kick-off meeting by coming prepared with questions. At the kick-off meeting, we will: <br />• Introduce our project team <br />• Discuss project drivers <br />• Establish project goals and objectives <br />• Finalize the work plan and schedule <br />• Discuss pricing objectives, including equity, affordability, and revenue stability <br />• Discuss changes to rate structures if desired <br />• Discuss the data request and any additional data requirements <br /> <br />Before the meeting, we will prepare an agenda and provide staff with presentation materials. <br /> <br />Task 1 also includes time for quality assurance/quality control (QA/QC) after each task. A Senior Consultant or equal <br />staff member with at least five years of experience will review the model. Combined with the Project Manager's review, <br />this review will minimize errors and provide alternative perspectives/approaches to the model. <br /> <br />MEETINGS: <br />• One virtual kick-off meeting and two virtual meetings with staff to research and collect data <br /> <br />DELIVERABLES: <br />• Data request list, kick-off meeting agenda, presentation materials, and meeting minutes <br /> <br />Task 2: Water and Sewer Connection Fees <br />Raftelis will calculate water and sewer system development charges (SDCs) (which also go by various names such as <br />connection fees, impact fees, and capacity fees). Raftelis will calculate the SDCs using three different methodologies. The <br />various approaches used to calculate SDCs have largely evolved on the basis of changing public policy, legal <br />requirements, and the unique and special circumstances of each agency. However, three approaches are widely accepted <br />and appropriate for water and wastewater SDCs. The first is the buy-in approach, which rests on the premise that new <br />customers are entitled to service at the same price as existing customers. However, existing customers have already <br />developed the facilities to serve new customers, including the costs associated with financing those services. Under this <br />approach, new customers pay only the amount equal to the net investment already made by existing users. The second <br />approach is the incremental cost approach, where new customers pay for additional capacity requirements, irrespective of <br />the value of past investments made by existing customers. The last approach is a hybrid of the two methodologies <br />mentioned above, acknowledging the relative share of existing capacity available to future users versus the share of <br />additional capacity to be constructed in order to serve new connections. <br /> <br />Page 28 of 554
The URL can be used to link to this page
Your browser does not support the video tag.