Laserfiche WebLink
<br />4141352.1 3 <br /> <br />− Community Engagement: The City will conduct a workshop with Zone 7 at the beginning of <br />Phase I to develop a community engagement strategy. The City will lead community <br />engagement efforts including notification of exploratory drilling activities / impacts and <br />outreach to receive input. The City will also provide ongoing interfacing with the community <br />and neighbors of the potential Project as needed. Zone 7 will provide technical information and <br />support for community engagement. <br />- City Deliverables: <br />o Minutes from community engagement workshop <br />o Public notifications <br />− Well Siting: Zone 7 will lead efforts to identify the top three (3) recommended locations for <br />exploratory test drilling and potential installation of production well facilities. The siting <br />review will prioritize locations based on factors such as Zone 7 groundwater modeling and <br />historical information on anticipated water yield and quality, proximity to the PFAS plume, <br />proximity to Zone 7 connecting treatment and transmission facilities, impacts to Hopyard 6 and <br />Hopyard 9 pumping capacity and other nearby groundwater extraction facilities, O&M access, <br />land use rights, City operational impacts, and community impacts. <br />- Zone 7 Deliverables: <br />o Draft and Final Well Siting Technical Memorandum (TM) <br />- City Deliverables: <br />o Review comments to Draft Well Siting TM <br />- Milestones: <br />o Final Well Siting TM and associated recommendations will be approved by the <br />Steering Committee prior to proceeding with exploratory test drilling. <br />− Exploratory Test Drilling: Zone 7 will lead efforts to perform exploratory test drilling at the <br />three (3) recommended locations documented in the Final Well Siting TM. Exploratory test <br />drilling activities will include installation of test wells, analyzing water quality and yields at <br />discrete zones, and providing reports to document findings. As the lead agency, Zone 7 will file <br />appropriate California Environmental Quality Act (“CEQA”) document(s) for the exploratory <br />drilling and obtain necessary permits, enter into agreement with a contractor to perform work <br />through a competitive bid process consistent with Zone 7 procedures, and oversee contractor’s <br />work including administration, project management, construction management, field <br />inspection, and reporting. <br />The City may identify one additional location within the Bernal subbasin for exploratory test <br />well drilling. This location will be included in the bid documents as an optional task of the <br />scope of work. If this additional location is pursued, the City will enter into a separate bilateral <br />agreement with contractor and manage all related efforts and pay for 100 percent of the related <br />costs, which is not included in the not-to-exceed limit of this agreement. <br />- Zone 7 Deliverables: <br />o CEQA documentation and permits <br />o Draft and final bid documents, award of contract(s), notice to proceed <br />o Project management, field inspections, and periodic reporting <br />Page 174 of 248