My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2281 <br />Page 19 of 32 <br />1. MRP <br />2. C.3 Technical Guidance Manual <br />The above referenced documents, as amended and reissued from time to <br />time, are incorporated by reference into this chapter. These documents shall <br />be available for download at the Alameda Countywide Clean Water Program <br />website. <br />C. Regulated Projects, as defined in the MRP, are required to incorporate additional <br />site design, stormwater treatment, and/or hydromodification management <br />measures. These measures are required to remain in place throughout the life of <br />the development project to address stormwater runoff pollutant discharges and <br />prevent increases in runoff flow rates and volumes. Applicants for development <br />projects shall select, design and construct site design, stormwater treatment, and <br />hydromodification management measures, as applicable, to the satisfaction of <br />the [Agency] in accordance with the requirements and guidelines set forth in the <br />most current version of following documents: <br />1. MRP <br />2. C.3 Technical Guidance Manual <br />The above referenced documents, as amended and reissued from time to <br />time, are incorporated by reference into this chapter. These documents shall <br />be available for download at the Alameda Countywide Clean Water Program <br />website <br />D. Regulated Projects shall include LID/GSI treatment measures, as set forth in the <br />MRP per the following provisions: <br />1. Project phasing. Project proponents may not phase projects to avoid <br />implementing stormwater requirements. <br />2.Subdivisions of land. Parcels of land which are subdivided for future <br />construction shall make provision for stormwater requirements anticipating <br />future build out. Stormwater improvements shall be considered part of the <br />infrastructure and are required to be installed with other infrastructure <br />improvements. <br />3.Placement of LID/GSI treatment measures in common areas. In <br />subdivisions, stormwater treatment systems shall be placed in a publicly <br />accessible area unless prior approval has been obtained by the authorized <br />enforcement official. <br />Page 217 of 248
The URL can be used to link to this page
Your browser does not support the video tag.