My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 37 <br />Table 7 Combined Annual Emissions <br />Emission Source Annual Emissions (MT CO2e) <br />Construction1 32 <br />Operational 23 <br />Mobile 144 <br />Area <1 <br />Energy 11 <br />Water 3 <br />Waste 4 <br />Refrigerant <1 <br />Existing (139) <br />Net Emissions 55 <br />Emissions Per Capita 44 (41 residents and 6 employees) <br />1.3 <br />City of Pleasanton CAP Numeric Threshold (MT of CO2e per Capita) 4.1 <br />Exceed Threshold? No <br />MT CO2e = metric tons of carbon dioxide equivalent <br />1 Amortized construction related GHG emissions over 30 years <br />Source: See Appendix A for the CalEEMod worksheets <br />Plan Consistency <br />Several plans have been adopted to reduce GHG emissions in Pleasanton and at the State level, <br />including the CARB’s 2022 Scoping Plan and the City of Pleasanton CAP. Similar to the DSP EIR, the <br />Barone’s project would comply with applicable State and local energy efficiency, renewable energy, <br />green building, water conservation, and solid waste diversion requirements for new construction. <br />The proposed residences would include all-electric appliances and would include a 3.0 kilowatt solar <br />panel for each of the proposed single family residences. In addition, two electric vehicle parking <br />charging stations would be installed for the commercial buildings. The project would also be located <br />a quarter mile from existing transit and other commercial and residential land uses. The project <br />would be Leadership in Energy and Environmental Design (LEED) silver certified. Pursuant to PMC <br />Section 20.26.370, Section 5.106.13 added—All-electric buildings the proposed residences would be <br />all-electric and would have no natural gas or propane plumbing installed. <br />As a result, the Barone’s project would be consistent with the CARB’s 2022 Scoping Plan goal to <br />decarbonize buildings and electrify transportation, as well as consistent with the Pleasanton CAP <br />threshold. In addition, the project would be consistent with Pleasanton’s Primary CAP 2.0 actions, <br />such as BE-1 Advance the Decarbonization of Building, BE-3 Expand Use of Renewable Energy, TLU-1 <br />Advance Vehicle decarbonization, and WR-1 Improve Water Supply & Increase Conservation. <br />Therefore, the project would not result in cumulatively considerable GHG emissions.
The URL can be used to link to this page
Your browser does not support the video tag.