Laserfiche WebLink
City of Pleasanton <br />475 and 493 St. John Street Mixed-Use Project <br /> <br />38 <br />Energy <br />CONSTRUCTION <br />Construction of the Barone’s project would result in short-term consumption of energy from the use <br />of construction equipment and processes. Energy use during construction would be primarily from <br />fuel consumption to operate heavy equipment, light-duty vehicles, machinery, and generators. <br />Temporary grid power may also be needed for construction trailers or electric construction <br />equipment. Energy use during construction would be temporary in nature, and construction <br />equipment used would be typical of construction projects in the region. Similar to the <br />manufacturers utilizing energy conservation methods to reduce costs, it is reasonable to assume <br />contractors would avoid wasteful, inefficient, and unnecessary fuel consumption during <br />construction to reduce construction costs. The project would comply with the CARB In-Use Off-Road <br />Diesel-Fueled Fleets Regulation, which imposes limits on idling and restricts the use of older <br />vehicles. This would reduce fuel consumption and lead to the use of fuel-efficient vehicles on the <br />construction site. Construction equipment would be maintained to applicable standards, and <br />construction activity and associated fuel consumption and energy use would be temporary and <br />typical for construction sites. The CALGreen Building Standards Code includes specific requirements <br />related to recycling, construction materials, and energy efficiency standards that would apply to <br />construction of the proposed project to minimize wasteful, inefficient, and unnecessary energy <br />consumption. Therefore, project construction would not result in potentially significant <br />environmental effects due to the wasteful, inefficient, or unnecessary consumption of energy, and <br />no impact would occur. Impacts would not be greater than those determined in the Final EIR. <br />OPERATION <br />Operational energy use would include use of transportation fuel. California requires that all <br />motorists use California Reformulated Gasoline, a cleaner formulation of gasoline that results in <br />lower emissions of ozone, CO and other air pollutants when burned. The introduction of mixed <br />commercial and residential land uses, close to one another, further promotes a higher-density <br />mixed-use land use pattern that is intended to reduce vehicle trip lengths and subsequent <br />transportation energy use. <br />In addition to transportation energy use, operation of the project would consume electricity for <br />building heating and power, lighting, and water conveyance, among other operational <br />requirements. The proposed project would increase the total amount of electricity consumed <br />compared to the existing uses on the project site. In compliance with the PMC, the project would <br />not utilize natural gas for the proposed residential uses. Project energy consumed would represent <br />an incremental increase in energy usage compared to existing energy use in Pleasanton, and the <br />project would implement energy-efficient components to reduce energy demand. Additionally, the <br />project would meet CALGreen specific requirements for energy efficiency in new development and <br />would incorporate Water Efficient Landscape Ordinance features. Therefore, construction and <br />operation of the proposed project would not result in potentially significant environmental effects <br />due to the wasteful, inefficient, or unnecessary consumption of energy and this impact would be <br />less than significant. <br />Overall, the project would result in less than significant impacts related to energy.