My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 39 <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to greenhouse gas emissions <br />and energy compared to those identified in the Final EIR, and no new mitigation measures are <br />necessary. <br />Conclusion <br />Impacts related to greenhouse gas emissions would be less than significant, and would be reduced <br />compared to the significant and unavoidable impacts identified in the Final EIR. Impacts related to <br />energy would be less than significant, similar to the Final EIR. No significant new or substantially <br />increased greenhouse gas emissions or energy impacts would occur compared to those identified in <br />the Final EIR. <br />5.6 Geology and Seismicity <br />Impacts Identified in the Certified Final EIR <br />The Final EIR determined that although the DSP area does not overlie a known earthquake fault, the <br />DSP area is within a seismically active region and would be subject to strong ground shaking, <br />liquefaction, and lateral spreading. However, development in the DSP area would be subject to <br />several existing state and local regulations that require site-specific geological investigations and <br />design elements to minimize susceptibility to seismic events. Development would be required to <br />comply with Chapter 17.12.050 of PMC, which requires preparation of geotechnical investigation <br />reports to characterize existing geologic hazards and risks. Additionally, several existing General Plan <br />policies would restrict development in hazardous areas, sloped lots, and earthquake fault zones. <br />Due to the generally flat topography of the DSP area, there is a low probability of landslides. <br />Therefore, the Final EIR concludes that implementation of the DSP would not expose people or <br />structures to risk of loss, injury, or death associated with earthquake fault zones, strong seismic <br />ground shaking, liquefaction, or landslides, and impacts would be less than significant. <br />Development within the DSP area would be required to connect to existing wastewater <br />infrastructure and would not utilize alternative wastewater disposal systems or septic tanks. The <br />Final EIR determined that the DSP would have no impact related to soils incapable of adequately <br />supporting the use of septic tanks or other wastewater disposal systems. <br />Impacts of the Barone’s Project <br />The following analysis incorporates information from the Geotechnical Investigation prepared for <br />the project by Geo-Logic Associates in June 2022. The Geotechnical Investigation is included as <br />Appendix D. Section 1803.1.1.3 of the California Building Code (CBC) states that the building <br />department of each locality (in this case the Pleasanton Building Division) must approve the soil <br />investigation if it determines that the recommended action is likely to prevent structural damage in <br />each dwelling. Further, as a condition of the building permit, the approved recommended action <br />must be incorporated in the construction of each dwelling. Therefore, pursuant to the PMC and the <br />CBC, the recommendations included in the Geotechnical Investigation (Appendix D) would be <br />incorporated into the design of the project and verified by the City prior to issuance of a building <br />permit.
The URL can be used to link to this page
Your browser does not support the video tag.