Laserfiche WebLink
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 41 <br />The Geotechnical Investigation evaluated soils at the project site and determined that soils have low <br />expansion potential (Appendix D). Additionally, as discussed previously, the project would be <br />required to comply with the CBC and the recommendations of the Geotechnical Investigation, which <br />would further minimize risk associated with expansive soils. Therefore, the project would not result <br />in substantial direct or indirect risks to life or property associated with expansive soils, and impacts <br />would be less than significant. <br />As discussed in the Final EIR for the DSP, development in the DSP area would be required to connect <br />to existing wastewater systems. The project would not involve use of a septic system or alternative <br />wastewater systems, and there would be no impact. <br />Overall, with compliance with the CBC, PMC, and the recommendations made within the <br />Geotechnical Investigation, the proposed project would have less than significant impacts <br />associated with geology and seismicity. <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to geology and seismicity <br />compared with those identified in the Final EIR, and no new mitigation measures are necessary. <br />Conclusion <br />Impacts would be less than significant, similar to the Final EIR, and no significant new or <br />substantially increased geology and seismicity impacts would occur compared to those identified in <br />the Final EIR. <br />5.7 Hazards and Hazardous Materials <br />Impacts Identified in the Certified Final EIR <br />Because the DSP would facilitate the development of commercial uses, the Final EIR acknowledges <br />that development could require the routine use, transport, and disposal of hazardous materials. <br />These materials would be subject to several federal, state, and local regulations pertaining to the <br />use, transportation, treatment, disposal, and accidental release of hazardous materials, and <br />compliance with these regulations would minimize the potential for the DSP to result in a significant <br />hazard to the public or environment related to hazardous materials. Similarly, because the DSP <br />would not introduce land uses that would handle or emit large amounts of hazardous materials such <br />as industrial land uses, the Final EIR concludes impacts related to the release of hazardous materials <br />would be less than significant. <br />The DSP would introduce a variety of land uses within 0.25 mile of three existing Pleasanton Unified <br />School District schools, as well as multiple childcare centers. While construction and operation of <br />projects facilitated by the DSP would involve the use of hazardous materials, they would be in small <br />quantities and would not present a substantial risk to nearby schools and childcare centers. As <br />discussed above, the use, transport, and disposal of hazardous materials would be subject to several <br />federal, state, and local regulations that would minimize the risk of hazardous emissions. Therefore, <br />the Final EIR concludes that compliance with existing regulations would minimize impacts to schools <br />and childcare centers to a less than significant level.