Laserfiche WebLink
City of Pleasanton <br />475 and 493 St. John Street Mixed-Use Project <br /> <br />42 <br />The Final EIR identified 11 sites in the DSP area which are located on a list of hazardous materials <br />sites complied pursuant to Government Code Section 65962.5, one of which is active. The Final EIR <br />concludes that compliance with existing federal, state, and local regulations pertaining to <br />development on designated hazardous materials sites would minimize potential impacts to a less <br />than significant level. <br />The Final EIR determined that there are no airports within two miles of the DSP area and <br />development facilitated by the DSP would not be subject to safety hazards associated with an <br />airport or private airstrip. Impacts would be less than significant. <br />The DSP area is subject to the emergency response and operation plans of Alameda County and the <br />City of Pleasanton. The Final EIR determined that development facilitated by the DSP would be <br />subject to DSP policies regarding emergency access, as well as PMC design standards for new roads <br />and buildings which would ensure adequate emergency vehicle access. Therefore, the Final EIR <br />concludes that compliance with the DSP policies and the PMC would minimize impacts related to <br />emergency evacuation or response to a less than significant level. <br />Because the DSP area is not adjacent to undeveloped lands or wildlands, the risk of wildfire is low <br />and the Final EIR concluded that development facilitated by the DSP would not expose people ort <br />structures to a significant risk of loss, injury, or death involving wildland fires. Impacts would be less <br />than significant. <br />Impacts of the Barone’s Project <br />The following analysis incorporates information from the Phase I Environmental Site Assessment <br />and Subsurface Investigation (ESA) prepared for the project by Ramboll Consulting, Inc. In <br />November 2020. The ESA is included as Appendix E. The ESA identified one recognized <br />environmental condition within the project site, which consisted of areas of elevated lead in shallow <br />soil. The top two feet of soil near current and former structures within the site contain <br />concentrations of lead that exceed State regulatory screening criteria for residential land use but is <br />below federal thresholds. Grading for building pads is expected to reach as much as three feet <br />below the surface and excavations for utility lines and stormwater infrastructure would reach as <br />much as nine feet below the surface. The ESA also identified a potential former underground <br />storage tank within the project site; however, subsurface soil sampling did not identify fuel <br />constituents or other contaminants that exceed screening criteria for residential land use, and no <br />further investigation was recommended (Appendix E). <br />The project would result in the construction and operation of a new mixed-use development. <br />Project construction would include the temporary transport, storage, use, or disposal of potentially <br />hazardous materials including fuels, lubricating fluids, cleaners, solvents, or project site soils <br />containing elevated levels of lead. If spilled, these substances could pose a risk to the environment <br />and to human health. However, as discussed in the Final EIR, the transport, storage, use, or disposal <br />of hazardous materials is subject to various federal, state, and local regulations designed to reduce <br />risks associated with hazardous materials, including potential risks associated with upset or accident <br />conditions. Such regulation includes U.S. Department of Transportation regulations (Hazardous <br />Materials Transport Act, 49 Code of Federal Regulations, Resources Conservation and Recovery Act, <br />Hazardous Waste Control Law (California Health and Safety Code Division 20, Chapter 6.5), and the <br />Hazardous Waste Control Regulations (Title 22, California Code of Regulations, Divisions 4 and 4.5). <br />Additionally, project construction would involve grading of soils potentially contaminated with lead <br />and demolition of all structures on site except the existing single-family residence, and due to their <br />age, these structures may contain asbestos. Demolition and grading could result in upset and