My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
11/13/2024 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />pumps to pull water from Zone 7's system and increase the pressure to the City's system- <br />desired water-pressure setting. It will also be designed to meet the future peak demand of <br />5,200 gpm. <br /> <br />As the existing site has minimal space, staff and the City’s design consultant, Woodard & <br />Curran, Inc., developed plans and a request for proposals to solicit bids for purchasing a <br />prefabricated (built off-site) booster station. The existing turnout, fluoride system, and traffic <br />signal controller will remain in operation during construction. <br /> <br />DISCUSSION <br />The procurement of the pre-packaged booster station was done in conformance with the <br />Uniform Public Construction Cost Accounting Act 22002.5, which allows flexibility from the <br />conventional design, bid, and build process for public works projects necessary to maintain <br />publicly owned water, power, or waste disposal systems. <br /> <br />The consultant solicited proposals from several qualified pre-packaged booster stations <br />through a Request for Proposal process outlining the station's requirements. Proposals were <br />received in February 2024, ranging from $1.7 million - $1.8 million, exceeding the Engineer’s <br />estimate of $850,000. After a detailed review, the project was value-engineered, which <br />reduced the building size, modified the style of pumps, and clarified electrical equipment <br />needs. A value-engineered proposal was developed, and three new proposals were received <br />in August 2024, ranging from $1.17 million - $1.23 million. <br /> <br />The City’s design consultants reviewed and approved the proposals, and confirmed the system <br />would meet the City’s needs and that the design and pricing were valid. The designer reviewed <br />their original engineer’s estimate and updated it to $1.2 million, with the earlier estimates not <br />reflecting the market costs for the electrical and control equipment and the building structure. <br />After the purchase order, City staff and the manufacturer will work through the specifics of the <br />equipment and finishes. <br /> <br />The City Engineer reviewed and confirmed that the solicitation and selection process <br />conducted by the design consultant is in alignment with the City’s purchasing requirements <br />and recommends awarding a purchase order in the amount of $1.17 million to Shape <br />Incorporated of Pleasanton, California, for the Turnout No. 4 Pre-Packaged Booster Station <br />Procurement, CIP No. 24181. In addition, staff recommends approving a 10 percent <br />contingency (not to exceed $117,000) to cover potential City-requested changes and <br />modifications during the shop drawing process. <br /> <br />Engineer’s Estimate Shape Flow-Line Romtec <br />$1,200,000 $1,170,000 $1,221,960 $1,228,875 <br /> <br />The pre-packaged system will be housed in a 14-foot by 18-foot by 10-foot-tall fiberglass <br />building (similar to the recycled water booster station in Ken Mercer Sports Park) mounted to a <br />metal skid that allows for the building and equipment to be set in one piece. It will house three <br />50-horsepower pumps and motors that will deliver a firm capacity of 5,600 gpm and peak <br />capacity of 7,000 gpm, meeting the City’s current and future demands. All electrical equipment, <br />including PG&E metering, generator connections, and controls, are included. The installation <br />of the pre-packaged booster station was included in the construction contract with JMB <br />Page 175 of 658
The URL can be used to link to this page
Your browser does not support the video tag.