My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
121724
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 11:39:08 AM
Creation date
12/11/2024 11:13:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/17/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> WATER CAPACITY AND MISCELLANEOUS FEE STUDY 8 <br />The basic economic philosophy behind connection fees is that those who receive utility from the product should <br />pay for service costs. To effect fair distribution of the system's value, the charge should reflect a reasonable estimate <br />of the cost of providing capacity to new users and not unduly burden existing users through a comparable rate <br />increase. Accordingly, many utilities make this philosophy one of their primary guiding principles when <br />developing their connection fee structure. <br /> <br />The philosophy that service should be paid for by those who receive utility service is often referred to as “growth- <br />should-pay-for-growth.” The principle is summarized in the American Water Works Association (AWWA) Manual <br />M26: Water Rates and Related Charges: <br />“The purpose of designing customer-contributed-capital system charges is to prevent or reduce the inequity to <br />existing customers that results when these customers must pay the increase in water rates that are needed to <br />pay for added plant costs for new customers. Contributed capital reduces the need for new outside sources of <br />capital, which ordinarily has been serviced from the revenue stream. Under a system of contributed capital, <br />many water utilities are able to finance required facilities by use of a ‘growth-pays-for-growth’ policy.” <br />This principle, in general, applies to water and wastewater systems. In the excerpt above, customer-contributed <br />capital system charges are equivalent to connection fees. <br /> <br />Legal Framework and California Requirements <br />In establishing connection fees, it is important to understand and comply with local laws and regulations governing <br />establishing, calculating, and implementing connection fees. The following sections summarize Raftelis’ <br />understanding1 of the regulations applicable to developing connection fees for the City. <br /> <br />Connection fees must be established based on a reasonable relationship to the costs and benefits of the development <br />or expansion. Courts have long used a standard of reasonableness to evaluate the legality of development charges. <br />The basic statutory standards governing connection fees are embodied by California Government Code Sections <br />66013, 66016, 66022, and 66023. Government Code Section 66013 contains requirements specific to determining <br />utility development charges: <br />“Notwithstanding any other provision of law, when a local agency imposes fees for water connections or <br />sewer connections, or imposes capacity charges, those fees or charges shall not exceed the estimated reasonable <br />cost of providing the service for which the fee or charge is imposed, unless a question regarding the amount the <br />fee or charge in excess of the estimated reasonable cost of providing the services or materials is submitted to, <br />and approved by, a popular vote of two-thirds of those electors voting on the issue.” <br /> <br />Section 66013 also includes the following general requirements: <br />x Local agencies must follow a process set forth in the law, making certain determinations regarding the <br />purpose and use of the charge; they must establish a nexus, or relationship, between a development project <br />and the improvement being financed with the charge. <br />x The capacity charge revenue must be segregated from the General Fund to avoid commingling of <br />connection fees and the General Fund. <br /> <br />1 Raftelis does not practice law, nor does it provide legal advice. Our discussion provides a general overview of Raftelis’ <br />understanding as utility rate and charges practitioners and is labeled “Legal Framework and California Requirements” <br />for literary convenience only. The City should consult with its legal counsel for clarification and/or specific guidance. <br />Page 155 of 893
The URL can be used to link to this page
Your browser does not support the video tag.