DRAFT <br />CIPPP-01 <br />Page 14 of 16 <br />Appendix A <br />Annual Core CIP Projects <br />An Annual Project is based on a reoccurring program with fixed investment to ensure timely repair <br />and replacement of aged infrastructures to minimize emergency unplanned projects. Not all assets <br />should have an annual program, and assets the City must have in order to have the basic, core <br />operation of the city should be considered for an annual program. Annual programs replace assets <br />with the same or equivalent assets, with upgrades for code requirements, but it is not to increase <br />capacity/size/change designs of the system. Annual programs are also set up when there is a known <br />regulation with which the City must comply. <br />Guided by City Council approved plans such as Asset Management Plan(s), Water System <br />Management Plan, Sewer System Master Plan, Urban Forest Master Plan, etc., a budget is <br />recommended through the CIP cycle that aligns with the City’s biennial budget cycle. <br /> <br />Annual Transportation Program <br />XX503 Annual Street Resurfacing <br />This annual project involves resurfacing and reconstruction of various city streets with a new layer <br />of asphalt. Street locations will be determined by the Pavement Management System (PMS) survey <br />data. The project will include performing base repairs and crack sealing, replacement of existing <br />traffic loop detectors, installation of traffic signal cameras, and reconstruction of pavement surface <br />approaches to signalized intersections. Traffic striping will be updated to accommodate new bike <br />lanes in accordance with the Bicycle and Pedestrian Master Plan. <br />Pavement Management Program (last updated 2/2024) is recommended for $5 million annual <br />expenditure over the next five years to maintain current PCI of 77. <br />XX504 Annual Slurry Seal <br />This annual project provides for the slurrying of various city streets with slurry seal. Actual locations <br />will be determined after reviewing the Pavement Management System (PMS) survey data and field <br />information analysis, which is completed on a biannual basis. Traffic striping will be updated to <br />accommodate new bike lanes, where possible, in accordance with the Bicycle and Pedestrian Master <br />Plan and Complete Streets Policy. The Metropolitan Transportation Commission recommends a <br />minimum of 20 percent of roadway surface funding to be allocated to preventative maintenance <br />treatments such as slurry seal; this is to capture the cost benefits of maintaining streets in good <br />condition before they start reaching the exponential decline of the roadway. <br />Pavement Management Program (last updated 2/2024) is recommended for $1 million annual <br />expenditure over the next five years to maintain current PCI of 77. <br />XX509 Annual Curb and Gutter & ADA Ramp <br />As part of the annual resurfacing of city streets, various sections of curb and gutter must be replaced <br />Page 321 of 893