Laserfiche WebLink
1 <br />RESOLUTION NO. 2024-XX <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANTON <br />APPROVING AND ADOPTING THE NEXUS STUDIES PREPARED BY ECONOMIC <br />AND PLANNING SYSTEMS, INC., DATED NOVEMBER 25, 2024, AND BY RAFTELIS, <br />DATED OCTOBER 17, 2024; AND AMENDING THE MASTER FEE SCHEDULE TO <br />UPDATE THE EXISTING CAPITAL FACILITY, TRANSPORTATION DEVELOPMENT, <br />AFFORDABLE HOUSING, AND SEWER AND WATER CONNECTION FEES <br />WHEREAS,Chapters 3.22, 3.26 and 17.40 of the Pleasanton Municipal Code <br />respectively established the Capital Facilities, Transportation Development and <br />Affordable Housing Fees; and Chapters 14.04 and 15.05 of the Pleasanton Municipal <br />Code respectively establish the charges for connection to the City’s water and sewer <br />systems; and <br />WHEREAS, these various chapters provide that such fees and charges shall be <br />adopted by resolution of the City Council; and <br />WHEREAS, Assembly Bill No. 602, signed into law on September 28, 2021, and <br />effective January 1, 2022, requires that a local agency that conducts an impact fee <br />nexus study after January 1, 2022, must comply with new standards and practices, <br />including, but not limited to, calculating fees levied or imposed on a housing <br />development project to be proportionate to the square footage of proposed units, but <br />with such requirement not applicable to sewer and water connection fees ; and <br />WHEREAS,the City has undertaken a comprehensive review of the Capital <br />Facility, Transportation Development, and Affordable Housing Fee, with the latter <br />inclusive of fees for commercial development (referred to as the Commercial Linkage <br />Fee) and residential development (referred to as the Affordable Housing In-Lieu Fee), to <br />reflect the improvements described in the 2005-2025 General Plan, the most recent 5- <br />Year Capital Improvement Program, and Pleasanton Development Impact Fee Long- <br />Term Capital Improvement Program that in part form a basis for such fees as detailed in <br />the Fee Update and Nexus Study for the City of Pleasanton Development Impact Fee, <br />Commercial Linkage Fee, and Affordable Housing In-Lieu Fee prepared by Economic <br />and Planning Systems (EPS) dated November 25, 2024, attached hereto as Exhibit A, <br />and incorporated by this reference and adopts the findings contained therein. The <br />Development Impact Fee Study shall be made available for public inspection within the <br />office of the City Clerk, and on the City’s website within 30 days of adoption and <br />WHEREAS, the City has undertaken a comprehensive review of the charges for <br />connection to the water and sewer system (referred to as the water and sewer <br />connection fees), to reflect the improvements described in the Water Distribution <br />System Capacity Master Plan and incremental wastewater system improvements that in <br />part form a basis for such fees or charges as detailed in the City of Pleasanton Water <br />and Wastewater Connection Fee Study prepared by Raftelis dated October 17, 2024 <br />ATTACHMENT 1 <br />Page 58 of 893