Page 3 of 4 <br />providing stability and protection from potential environmental hazards. <br />• Operational Testing, Startup, and Commissioning <br />Once the equipment is installed, operational testing, startup, and commissioning will be <br />performed to ensure all systems function as required and meet performance <br />specifications. <br /> <br />This project aims to restore the damaged electrical equipment to full operational capacity while <br />incorporating design enhancements that will improve resilience against future weather events. <br />Completing the project will result in installing an upgraded, fully operational electrical system <br />with enhanced monitoring and control capabilities. <br /> <br />Consultant/Specialty Services <br />Frisch Engineering was retained under the City’s on-call agreement to provide plans, <br />specifications, and estimates for the project. Frisch submitted a proposal in the amount of <br />$95,165 to provide additional engineering services required for this project. The additional <br />amount will support construction and engineering services, including reviewing submittals, <br />Requests for Information (RFI) and change order requests, field design support and SCADA <br />programming services. <br /> <br />Staff recommends the City Council approve a professional services agreement with Frisch <br />Engineering, Inc. (Attachment 4) for a not-to-exceed amount of $95,165 for: <br />• Additional Design Support: Additional engineering services to update design <br />drawings to incorporate City-requested changes. <br />• Construction Support Services: Ongoing construction support, including reviewing <br />shop drawings, responding to requests for information, conducting periodic inspections <br />related to electrical engineering, and performing witness testing as requested by the <br />City. <br />• SCADA Programming Services: Coordinate SCADA programming services for <br />startup, testing, and operational training in conjunction with the Motor Control Center <br />(MCC). <br /> <br />Bids <br />Sealed bids for this project were opened on February 19, 2025. Five bids were received; <br />however, the bid from Lords Electric, Inc. was deemed non-responsive due to missing <br />paperwork. The responsive bids ranged from $478,873 to $697,000 as compared with the <br />Engineer’s Estimate of $500,000 (see Attachment 1). The responsible lowest bid was received <br />from Telstar Instruments of Sacramento, CA, in the amount of $478,873, which is <br />approximately 4 percent lower than the Engineer’s Estimate. Past work performed by Telstar <br />Instruments was verified to be satisfactory. Staff recommends the City Council award the <br />construction contract to Telstar Instruments. <br /> <br />Schedule <br />Construction on the project will not occur until spring 2026 after the procurement of the <br />electrical equipment, which has an anticipated procurement period of 10-12 months due to <br />industry delays for Motor Control Centers. Once construction begins, the project is expected to <br />take five months to complete. <br />Page 179 of 348