My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
031825 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:43:51 PM
Creation date
3/12/2025 1:13:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br />2031). The table includes a column for the projection period between June 30, 2022 - January <br />30, 2023, as units that were permitted after June 30, 2022 are included in the current RHNA <br />cycle. Although production has trended upward, the first two years of the Housing Element <br />Cycle have yielded less than three percent of the City’s total RHNA target. <br /> <br />Current Cycle (2023-20231) RHNA Progress <br /> <br /> <br />Based on the existing market demand and approvals/entitlements issued in the past year and <br />pending, staff expects the City will issue a greater number of permits in 2024 as compared to <br />2023. Projects expected to begin construction include the 55-unit 3200 Hopyard Road project, <br />and the 42-unit 2025 Santa Rita Road project, both townhome developments. Staff is also <br />optimistic that permits will be issued for the remaining 284 apartment units at Avalon Bay, <br />where a portion of the project is already under construction. In addition, the number of ADUs <br />is anticipated to remain consistent over the next year. Despite these general trends, high <br />interest rates, ongoing construction cost increases and potential tariffs may affect housing <br />production, and it is difficult to predict whether the City will see a slow-down or increase in new <br />housing construction. <br /> <br />3. Progress on Housing Programs <br />Table D includes a status update on the 54 programs to be implemented during the 6th cycle <br />period. The Housing Element programs provide actionable steps to implement the City’s goals <br />and to further the City’s progress toward meeting its housing allocation. Some programs <br />contain quantified objectives, which refer to the number of units that are expected to be <br />constructed, preserved, or rehabilitated through the program during the planning period. <br />These quantified objectives represent measurable outcomes that can be used to benchmark <br />the success of each program. This Housing Element contains institutional changes intended to <br />significantly increase the amount and type of housing for all income levels in Pleasanton. <br />Significant progress has been made on many programs, including the following: <br />• Program 1.3: Adopt zoning standards consistent with the Bay Area Rapid Transit <br />(BART) Transit Oriented Development (TOD). In 2023, the City adopted Objective <br />Design Standards consistent with the provisions of AB 2923. The City also has <br />submitted for and received nomination for MTC/ABAG’s Priority Sites Program, <br />rezoned the site to be consistent with the 6th Cycle Housing Element, and in 2025 has <br />commenced concept planning for the site with BART and a consulting project team. <br />Page 93 of 348
The URL can be used to link to this page
Your browser does not support the video tag.