Page 3 of 18 <br />comments received on the DEIR, is expected to be published in March 2025. Once the FEIR is <br />available, the County will be able to schedule public hearings to consider approval of the <br />project with the County Planning Commission and Board of Supervisors. <br /> <br />Alameda County Housing Element <br />In October 2024, Alameda County published a revised draft Housing Element that included <br />both the Arroyo Lago and East Lakes sites in its sites inventory as “pipeline projects.” On <br />November 6, 2024, City staff submitted a letter about the sites inventory to the County, and <br />then met with County staff on November 21, 2024, and further submitted a second letter, <br />addressed to County staff and Board of Supervisors on November 26, 2024 (both letters are <br />included in Attachment 7). In this communication, City staff raised various concerns about <br />including the East Lakes site in the County’s Housing Element inventory, particularly in light of <br />the significant environmental concerns around the proposed offsite wastewater treatment plant <br />and provision of other public services. County staff considered City comments but elected to <br />not modify the County inventory. On December 12, 2024, the Board of Supervisors adopted <br />the County’s Housing Element, and on December 31, 2024, HCD issued a certification letter. <br /> <br />Technical Studies <br />The following technical studies have been or are being prepared to assist the City to review the <br />proposed Arroyo Lago and East Lakes projects: <br />• Fiscal Impact Analysis prepared by EPS (Attachment 3) <br />• Roadway Capacity Analysis prepared by Fehr & Peers <br />• Water Capacity Analysis prepared by Akel Engineering Group <br />• Sanitary Sewer Capacity Analysis prepared by Woodard and Curran <br /> <br />Note that each of the studies was prepared under the direction of City staff, with the majority of <br />costs for consultant services paid by the East Pleasanton applicants. Additional information on <br />the key findings of the technical studies is provided in the Discussion section of this report. <br /> <br />“City” Alternative Project Designs <br />The applicants have made clear their intent to continue processing both the Arroyo Lago and <br />East Lakes projects in Alameda County, pending any formal decision to proceed with <br />annexation to Pleasanton. However, the applicants have expressed willingness to work with <br />the City to modify the projects in conjunction with an annexation application, and after <br />considering feedback from neighbors of the Arroyo Lago Project, and from City staff regarding <br />both the Arroyo Lago and East Lakes projects, have submitted revised “City” versions of the <br />two projects, outlined below. <br /> <br />Arroyo Lago <br />On December 3, 2024, 330 Land Company (the applicant) submitted to the City a preliminary <br />review application for the Arroyo Lago project including the following modifications for a “City” <br />project (Attachment 4 includes excerpted pages from the plan set submitted): <br />• Revised utilities and grading plan. The “City” project would connect to the municipal <br />water and sewer system, eliminating the need for the privately operated wastewater <br />treatment facility and other off-site water and sewer improvements proposed for the <br />County project. <br />Page 202 of 749