Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />116 <br />Therefore, development as proposed would not result in any environmental <br />effects that are peculiar to the proposed project. The proposed project <br />would not result in a new or more severe adverse impact that was not <br />previously identified in the Housing Element Update FEIR. <br />b) Soil Erosion or Topsoil Loss <br />Would the project: Result in substantial soil erosion or the loss of topsoil? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that development consistent <br />with the Housing Element Update would involve construction activities such <br />as stockpiling, grading, excavation, paving, and other earth-disturbing <br />activities that could result in soil erosion or the loss of topsoil. Soil erosion is <br />dependent on individual site locations and conditions on-site during <br />construction. <br />The Housing Element Update FEIR concluded that, for construction activities <br />that disturb one or more acre of land surface, compliance with the National <br />Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater <br />Discharges Associated with Construction and Land Disturbance Activities <br />(Order No. 2012-0006-DWQ)12 would require development and <br />implementation of a Storm Water Pollution Prevention Plan (SWPPP). The <br />SWPPP would result in erosion and sediment controls, runoff water quality <br />monitoring, proper waste disposal, implementation of approved local plans, <br />control of construction sediment and erosion control measures, and <br />identification of maintenance responsibilities, as well as non-stormwater <br />management controls. In addition, compliance with CBC, applicable <br />Municipal Code requirements, as well as goals, policies, and programs <br />included as part of the General Plan would reduce potential soil erosion and <br />loss of topsoil from construction-related soil disturbance. As such, potential <br />impacts related to soil erosion and loss of topsoil would be reduced to less <br />than significant levels. <br />Proposed Project Analysis and Conclusion <br />As discussed above, the proposed project would be subject to the NPDES <br />General Permit (Order WQ 2022-0057-DWQ) because the proposed project <br />would disturb one acre or more of land surface. Also discussed above, the <br />NPDES General Permit requires a SWPPP and associated BMPs, which include <br />erosion and sediment controls, runoff water quality monitoring, proper waste <br /> <br />12 The NPDES General Permit has been updated to Order WQ 2022-0057-DWQ).