My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />136 <br />The Housing Element Update FEIR concluded that if a rezoned housing site is <br />suspected to contain hazardous materials, further site characterization <br />and/or remediation work would be required to ensure that construction <br />activities would not expose people or the environment to adverse effects, as <br />required by MM HAZ-2. Therefore, with implementation of MM HAZ-2 and <br />compliance with applicable federal, State, and local laws, as well as <br />compliance with appliable plans and regulations, as enumerated in more <br />detail in Section 3.8, Hazards and Hazardous Materials of the Housing Element <br />Update FEIR, impacts related to the creation of a hazard to the public or <br />environment would be less than significant. <br />Proposed Project Analysis and Conclusion <br />As discussed above, the Housing Element Update FEIR indicated that several <br />of the rezoned housing sites are located near identified contamination <br />sources that have not been fully remediated. MM HAZ-2 was included in the <br />Housing Element Update FEIR, which requires the preparation of a Phase I <br />ESA for sites affected by these areas. <br />A Phase I ESA was prepared on March 11, 2022 by Cameron-Cole for the <br />proposed project (Appendix F). The goal of the Phase I ESA is to identify the <br />presence (or likely presence) of hazardous substances or petroleum products <br />at the project site, under conditions that indicate an existing release, a past <br />release, or a material threat of release of any hazardous substances or <br />petroleum products into structures, the ground, groundwater, or surface <br />water. <br />The Phase I ESA identified several potential RECs associated with the project <br />site; however, the Phase I ESA concluded that only one REC was present at <br />the project site. <br />Records that were reviewed by Cameron-Cole indicate hydrocarbon- <br />impacted soils were previously documented in the southeastern portion of <br />the project site. Remediation was performed at this area and a cleanup goal <br />was achieved. Additional records indicate the presence of petroleum and <br />PCB-impacted soil in surface and subsurface samples at concentrations <br />above acceptable ESLs. Groundwater samples collected also identified <br />limited groundwater impacts. Vertical and lateral petroleum hydrocarbon <br />impacts have been identified in the vicinity of the subsurface “silo” area. The <br />Phase I ESA concluded that the presence of soil and groundwater impacts at <br />the project site above acceptable ESLs constitutes a REC at the project site.
The URL can be used to link to this page
Your browser does not support the video tag.