Laserfiche WebLink
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />154 <br />e) Water Quality Control or Sustainable Groundwater Management Plans Consistency <br />Would the project: Conflict with or obstruct implementation of a water quality control <br />plan or sustainable groundwater management plan? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that construction and operation <br />of any future development consistent with the Housing Element Update <br />could result in water quality impacts. In addition, future development <br />consistent with the Housing Element Update could lead to an increased <br />demand for water, which could lead to an increase in groundwater <br />pumping. <br />The Housing Element Update FEIR concluded that any future development <br />consistent with the Housing Element Update would be required to comply <br />with the General Plan policies and programs, the Municipal Code, and the <br />mandatory NPDES permit requirements. Therefore, during construction and <br />operation, future development consistent with the Housing Element Update <br />would not violate any water quality standards or otherwise substantially <br />degrade surface or groundwater quality, in compliance with the Water <br />Quality Control Plan for the San Francisco Bay Basin. Furthermore, <br />compliance the General Plan contains policies and programs that would <br />facilitate groundwater recharge by encouraging pervious surfaces in new <br />developments and requiring projects to meet federal, State, regional, and <br />local stormwater requirements, including stormwater infiltration. Therefore, <br />implementation of the Housing Element Update would not conflict with or <br />obstruct implementation of a water quality control plan or sustainable <br />groundwater management plan and impacts would be less than significant. <br />Proposed Project Analysis and Conclusion <br />The proposed project would be designed in accordance with the Preliminary <br />Stormwater Control Plan that was prepared for the proposed project. <br />As discussed above, under the Preliminary Stormwater Control Plan, the <br />proposed project is required to treat 100 percent of the runoff from <br />impervious surfaces within the project site; this would be achieved by <br />directing all runoff (i.e., roof, street, and driveway) to six proposed <br />bioretention basins located throughout the project site. <br />Landscaping would include planting several trees, which would improve <br />water quality by intercepting and storing rainfall on leaves and branch <br />surfaces thereby reducing runoff volumes and delaying the onset of peak