City of Pleasanton—Villages at the Quarry Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 213 <br />The Housing Element Update FEIR concluded that because development <br />consistent with the Housing Element Update would be subject to all <br />applicable State, regional, and City guidelines, standards, and specifications <br />related to service standards, including, but not limited to, those provided in <br />the City of Pleasanton Bicycle and Pedestrian Master Plan and CAP 2.0, it <br />would not conflict with adopted policies, plans, or programs. Therefore, the <br />Housing Element Update would result in a less than significant impact on the <br />circulation system, including transit, bicycle, and pedestrian facilities and <br />policies. <br />Proposed Project Analysis and Conclusion <br />Vehicular Site Access and Circulation <br />Access to the project site would be provided via roadway connections to <br />the external street network, one on Valley Avenue and one on Busch Road. <br />The connection to Valley Avenue would be made via a link to the existing <br />signalized intersection at Valley Avenue and Boulder Street. The connection <br />to Busch Road would be provided via a new unsignalized intersection at D <br />Street, connecting to Busch Road approximately 500 feet west of the PGS <br />entrance. Internal circulation within the project site would be provided via a <br />network of two-lane roadways extending through the project site. The TIA <br />prepared by Fehr & Peers in February 2025 (Appendix I) identified that the <br />two-lane internal roadways would be adequate to serve internal traffic <br />forecasts. <br />Furthermore, the proposed project would comply with the ODS as required <br />by the City. Therefore, the proposed project would have a less than <br />significant impact on vehicular access and circulation consistent with the <br />Housing Element Update. <br />Pedestrian Access and Circulation <br />The proposed project would construct sidewalks that meet the City’s <br />requirements on all internal streets. In addition, a 10-foot-wide shared-use <br />path with 2-foot shoulders would be constructed along the eastern side of <br />Valley Avenue, the southern side of Busch Road, the eastern side of Street D, <br />and the north side of Boulder Street, forming a loop for use by bicycles and <br />pedestrians (Exhibit 5). Crosswalks would be installed at internal intersections <br />wherein substantial numbers of pedestrians are expected to cross. <br />The TIA determined that while the proposed project includes a robust <br />pedestrian network within the project site, connections to the external