My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
04-23
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 5:17:26 PM
Creation date
4/22/2025 5:02:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Villages at the Quarry Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />228 <br />7’s storm drainage improvement costs. Compliance with City requirements <br />and policies would ensure that runoff would not inundate downstream storm <br />drainage facilities such that new or expanded facilities would be required. <br />Therefore, the Housing Element Update FEIR concluded that impacts would <br />be less than significant. <br />Electric Power, Natural Gas, and Telecommunications <br />The Housing Element Update FEIR indicated that future development <br />consistent with the Housing Element Update would be located within the <br />urban framework of the City and near existing infrastructure. The CAP 2.0 <br />includes strategies that would reduce the electricity and natural gas <br />consumption for development projects consistent with the Housing Element <br />Update. Implementation of the Housing Element Update would not result in <br />unplanned growth. As such, the utility providers take into consideration all <br />future growth projections in their planning efforts, and development <br />consistent with the Housing Element Update would not be expected to <br />require or result in new or expanded electricity, natural gas, or <br />telecommunications facilities beyond those already planned. Necessary <br />extensions and/or upgrades would generally occur within existing utility <br />easements. <br />In summary, the Housing Element Update FEIR concluded that development <br />consistent with the Housing Element Update would not require or result in the <br />relocation or construction of new or expanded water, wastewater treatment <br />or stormwater drainage, electric power, natural gas, or telecommunications <br />facilities, the construction or relocation of which could cause significant <br />environmental effects. Impacts would be less than significant. <br />Proposed Project Analysis and Conclusion <br />The proposed project’s water mains would connect to the City’s water mains <br />in Valley Avenue and Busch Road. While the proposed project’s sanitary <br />sewer mains would connect to the City mains at Valley Avenue and Busch <br />Road/Ironwood Drive, water service would be provided by the City with <br />water purchased from Zone 7. Sanitary sewer service would be provided by <br />the City, while sanitary sewer treatment would be provided by DSRSD. <br />Stormwater runoff would be collected and directed toward an underground <br />storm system, then stored and metered out of six proposed bioretention <br />basins located throughout the project site. Additionally, EBCE would provide <br />energy via electricity infrastructure provided by PG&E.
The URL can be used to link to this page
Your browser does not support the video tag.