Page 2 of 4 <br />The designed system will provide increased flow capacity to reduce the risk of damage from <br />future storms to the Puri Court area. <br /> <br />DISCUSSION <br />This project consists of replacing the existing storm drain pipe with approximately 415 linear <br />feet of 48-inch RCP storm drain and 52 linear feet of variable-sized box culvert, replacing the <br />storm drain manhole and headwall, and performing minor concrete work, including sidewalk, <br />curb and gutter, valley gutter, driveway, landscaping and irrigation, and surface restoration. <br /> <br />As Puri Court is a narrow street, it is not feasible to maintain continuous traffic and access <br />during active construction. City staff conducted neighborhood outreach meetings to discuss <br />construction impacts and offered alternatives such as offsite temporary parking, to lessen the <br />impacts. The contractor will be required to maintain a minimum of a clearly delineated 4-foot- <br />wide pedestrian path along the length of Puri Court at all times. <br /> <br />Due to the limited width of the public service easement (PSE) that the storm drain is within, <br />temporary construction easements are required to provide enough room to complete the work. <br />City staff worked with several property owners to secure the right of entry for construction and <br />staging. The property owners at 2 Puri Court and 3901 Foothill Road agreed to grant <br />temporary access to portions of their land for construction staging and temporary parking for <br />the residents. A discussion with the property owner at 4 Puri Court is nearing completion and <br />will be in place prior to construction. <br /> <br />Consultant/Specialty Services <br />On January 23, 2024, the City approved a task authorization to Pakpour Consulting Group, <br />Inc., under an existing on-call agreement to provide design services for the project. The design <br />fee was paid through the Annual Storm Repair/Replacement Project, CIP No. 24415. <br /> <br />Pakpour Consulting Group will provide additional engineering and construction support <br />services to review shop drawings and field design support and respond to requests for <br />information under an existing on-call agreement with the City. The task authorization will be <br />based on time and materials for construction support services for an estimated not-to-exceed <br />cost of $55,000. <br /> <br />Geocon Consultants will provide materials testing services under an existing on-call agreement <br />with the City. These services include required specialty testing of the materials for the backfill <br />and compaction of the trench backfill associated with the pipeline installation. The time and <br />materials services are estimated to cost $21,000. <br /> <br />Bids <br />Sealed bids for this project were opened on March 26, 2025. Nine bids were received, ranging <br />from $1,048,777 to $1,834,000, compared with the Engineer’s Estimate of $1.3 million (see <br />Attachment 1). The lowest responsible bid was received from DPI, Inc. of Livermore, <br />California, in the amount of $1,048,777, which is approximately 19 percent lower than the <br />Engineer’s Estimate. Staff reviewed the lowest bidder’s bid prices and deemed them to be <br />reasonable and acceptable. Past work performed by DPI, Inc. was verified to be satisfactory. <br />Staff recommends the City Council award the construction contract to DPI, Inc. <br /> <br /> <br />Page 177 of 223