My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
051325 SPECIAL
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 2:52:49 PM
Creation date
5/14/2025 10:07:37 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/13/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Nelson Fialho/Mr. David Haglund Page 11 <br />Preliminary Issues Assessment of Potential Colocation of Maintenance Facilities <br />construction to optimize and/or increase capacity (e.g., administrative/office space; <br />“boneyard”; the LPFD training area, excluding the tower; and the sewer building). <br />4.Opportunities to reduce space needs through shared services – Identify and assess <br />opportunities that could reduce space needs through coordination of services (e.g., <br />vehicle maintenance and repair, grounds keeping, em ergency operations center <br />functions and other ancillary services). <br />5.Parking and circulation requirements – Conduct a parking/circulation study of the OSC <br />that accounts for current and proposed uses on the site. <br />6.Parking impacts – Assess transportation options for employees and visitors to the site <br />that could reduce dependence on single occupancy vehicles and reduce overall parking <br />demand. <br />7.Utility impacts – Analyze communication requirements (e.g., , phone, internet), power <br />needs assessment to determine current capacity, future needs and cost to serve co- <br />located functions. <br />8.Infrastructure – Determine the infrastructure (roads, sewers, power) impacts and costs <br />of alternative options. <br />9.Cost/benefit analysis – Conduct a cost analysis of each option, including initial <br />planning/design, relocation, ongoing maintenance and future capital improvements , <br />including projected cost savings as a result of the project. <br />10.Agency cost impacts – Conduct an analysis to determine the appropriate pro-rata <br />distribution of costs of co-location between City and PUSD. <br />11.Implementation Action Plan – Prepare an estimated schedule and implementation plan <br />to fully understand the commitment required in time, resources and staffing to <br />undertaking such a project (including recommendations for public engagement and key <br />decision points (off ramps) for the City and PUSD to consider along the way. <br />Part 3: Recommended Next Steps <br />1.Discuss the results of the preliminary issues assessment with the City Council and <br />School Board to determine interest in further analysis. <br />2.Develop policy and operational parameters under which a comprehensive feasibility <br />study would proceed. <br />3.Identify the cost of conducting the feasibility analysis , who could conduct it, how it <br />would be paid for, which agency will be in the lead for managing the project, <br />composition of the project team, and a schedule for the feasibility analysis.
The URL can be used to link to this page
Your browser does not support the video tag.