My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 10:27:20 AM
Creation date
5/14/2025 10:18:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 11 <br />Figure 3: Village 4 Layout <br /> <br /> <br />Building Designs <br />The multiple-family rental units would be provided within four, three-story buildings except for <br />the one-story community center in Building C. The community center is intended to serve the <br />needs of the apartment residents, and it includes a manager’s office, multi-purpose room, <br />kitchen, laundry area, etc. In addition to the community center, Village 4 also provides an <br />approximately 7,800 square foot outdoor open-space area with shade structures and a <br />playground, located between Buildings A1 and A2. The design of the proposed multiple-family <br />buildings would complement that of the single-family homes and shows California-style <br />architecture characterized by composition shingle roof, cementitious board and batten siding, <br />stone veneer wall with precast wall cap at the ground floor porch, vinyl window with <br />cementitious trim, and trellis above the upper floor balconies, as shown in Figure 4 below. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 118 of 682
The URL can be used to link to this page
Your browser does not support the video tag.