My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 10:27:20 AM
Creation date
5/14/2025 10:18:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />frequency: the two BART Stations are classified as “Tier 3” stations and the ACE Station as a <br />“Tier 4” station. In addition to tiered density/intensity and parking standards, the policy offers, in <br />several areas, a “menu” of strategies and programs that can be deployed to meet key <br />objectives of the program, under the following four key areas or topics: <br />• Minimum densities for new residential and commercial office development <br />• Affordable housing production, preservation, protection, and anti-displacement and <br />stabilization <br />• Parking management <br />• Station access and circulation. <br /> <br />Attachment 2 provides an outline of the TOC policy, and an initial evaluation of compliance <br />relative to existing standards and policies in place and implications for Pleasanton with respect <br />to potential policy changes for the various stations. <br /> <br />While the TOC Policy broadly contemplates that jurisdictions will ultimately comply with all <br />policy requirements, in practical terms, compliance will be both evaluated and implemented <br />progressively. As described in the memorandum, many of the City’s existing zoning, programs, <br />and policies align with the TOC Policy, and/or are already subject to requirements of State law <br />in alignment with the TOC Policy. However, there are other areas in which the City will need to <br />evaluate and consider revisions to existing regulations, or the addition of policies or programs <br />toward achieving better compliance. <br /> <br />MTC-ABAG is currently developing its evaluation frameworks for “compliance” with the TOC <br />Policy. Based on recent drafts, the compliance evaluation will provide some flexibility to local <br />jurisdictions through a scoring framework that provides a scaled approach: <br />while full compliance will not be a pre-requisite to receive any funding, more compliant and <br />“fully compliant” jurisdictions will have access to more funding opportunities. There is a <br />geographic component, in that for cities with multiple stations subject to the TOC Policy, <br />compliance does not need to be “even” across all stations, but the scoring criteria will take into <br />account compliance for each station, factored into an overall compliance score. <br /> <br />The City’s initial compliance focus is expected to be on the east BART station, since this <br />station is the location of the future Valley Link hub and the site of the BART site <br />redevelopment; planned development densities, and supportive strategies with respect to <br />density, parking and station access have a high degree of correlation to the TOC Policy <br />Framework. And, as plans for the Stoneridge Shopping Center progress, staff anticipates there <br />will be a similar degree of correspondence between the vision for the mall to evolve to a <br />relatively high density, mixed use center that is well-connected to transit and the TOC policy. <br />Whereas, within the Downtown (much of which lies within a half-mile of the ACE Station), there <br />is much greater sensitivity around the “fit” and character of new development, parking and <br />other issues, and so seeking full TOC Policy compliance is likely to be a lesser focus. <br /> <br />The practical effect is that future OBAG 4 grants and investments, including Local Streets and <br />Road Maintenance, Bicycle and Pedestrian Improvements, Safe Routes to School Projects, <br />and Transportation Planning projects, will, as in past cycles, target transit-oriented and Priority <br />Development Areas and support focused growth at the stations prioritized for transit-oriented <br />development. <br />Page 144 of 682
The URL can be used to link to this page
Your browser does not support the video tag.