Page 2 of 3 <br />the contractor to “value engineer” the bid alternates, the City Council awarded an additional <br />construction contingency of $250,600 to construct the bid alternates. <br /> <br />DISCUSSION <br />The contractor has worked with the city to minimize unforeseen construction costs and has <br />also been able to install additional items not included in the contract award, including electrical <br />accommodations for holiday and event lighting along the new trail, dedicated lighting controls <br />for the flagpole lighting, and replacement of a previously damaged sidewalk on Neal Street. <br />The contractor has completed $912,054 of the construction work, including the approved <br />change orders for the above items, the Delucchi Park improvements, and the Stormwater <br />Pollution Prevention Plan (SWPPP), with $514,900 remaining in the contract. <br /> <br />The Lions Wayside Park improvements are nearing completion with the turf installed in mid- <br />April, the bandstand installation started in late April, and the Delucchi Park improvements now <br />under construction. Staff and the contractor expect that the remaining construction changes, <br />totaling approximately $45,000, as well as the lawn conversion at the Firehouse Arts Center, <br />trail through the 4363 First Street property, 24-stall parking lot and parking lot connection (with <br />associated landscape and hardscape improvements), and a brick fascia for the existing Chan <br />Henderson Bandstand, totaling approximately $240,000, could be combined and constructed <br />with the remaining construction contingency of $213,092 if the City Council approves the use <br />of the remaining fund balance of $72,860. <br /> <br />The proposed schedule for the project remains the same, with the construction of Lions <br />Wayside and Delucchi Parks anticipated to be completed by early July. However, the lawn <br />conversion, trail, and parking lot and parking connection at 4363 First Street are expected to <br />be completed later in the summer. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Climate Action Plan (CAP 2.0) in Transportation and Land <br />Use by promoting an effective alternative transportation system with walking and bicycling and <br />providing greater park accessibility for all users. <br /> <br />OUTREACH <br />During the outreach for the master plan update, the feedback received from the public <br />regarding the use of the 4363 First Street property was to provide a balance of parking and <br />recreation. The proposed improvements include additional parking, a trail, and landscaping to <br />provide that balance. The trail, parking lot, and landscape will provide a finished look for the <br />park project while still providing an opportunity for future improvements to fully address public <br />outreach priorities once funding is available. The conceptual plan was presented to the Parks <br />and Recreation Commission on May 8 and received positive feedback. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic plan goal of Investing <br />in Our Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) <br />to complete design and construction of budgeted capital projects, and Strategy 7 – Continue to <br />invest in parks, bicycle, and pedestrian infrastructure, and public art to improve traffic safety, <br />promote climate resilience, and increase equitable access to cultural and recreational <br />opportunities. <br />Page 209 of 682