My WebLink
|
Help
|
About
|
Sign Out
ITEM 16 ATT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
ITEM 16 ATT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:19:10 PM
Creation date
8/6/2025 9:47:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) A Claim disputing the amount of Final Payment must be submitted <br />within 15 days of the effective date of Final Payment. <br />(4) Strict compliance with these Claim submission deadlines is necessary <br />to ensure that any dispute may be mitigated as soon as possible, and to <br />facilitate cost-efficient administration of the Project. Any Claim that is not <br />submitted within the specified deadlines will be deemed waived by the <br />Contractor. <br />7-03. City's Response <br />City will respond within 45 days of receipt of the Claim with a written statement <br />identifying which portion(s) of the Claim are disputed, unless the 45 -day period is <br />extended by mutual agreement of City and the Contractor or as otherwise allowed under <br />Public Contract Code section 9204. However, if City determines that the Claim is not <br />adequately documented, City may first request in writing, within 30 days of receipt of the <br />Claim, any additional documentation supporting the Claim or relating to defenses to the <br />Claim that City may have against the Claim. If the Contractor fails to submit the <br />additional documentation to City within 15 days of receipt of City's request, the Claim <br />will be deemed waived. <br />(A) Additional Information. If additional information is thereafter required, it <br />may be requested and provided upon mutual agreement of City and Contractor. <br />(B) Non -Waiver. Any failure by City to respond within the times specified <br />above may not be construed as acceptance of the Claim in whole or in part, or as a <br />waiver of any provision of these Contract Documents. <br />7-04. Meet and Confer <br />If the Contractor disputes City's written response, or City fails to respond within 45 days <br />of receipt of the Claim with, the Contractor may notify City of the dispute in writing of <br />the sent by registered or certified mail, return receipt requested, and demand an informal <br />conference to meet and confer for settlement of the issues in dispute. If the Contractor <br />fails to dispute City's response in writing within the specified time, the Contractor's <br />Claim will be deemed waived. <br />(A) Schedule Meet and Confer. Upon receipt of the demand to meet and confer, <br />City will schedule the meet and confer conference to be held within 30 days, or <br />later if needed to ensure the mutual availability of each of the individuals that <br />each party requires to represent its interests at the meet and confer conference. <br />(B) Location for Meet and Confer. The meet and confer conference will be <br />scheduled at a location at or near City's principal office. <br />(C) Written Statement After Meet and Confer. Within ten working days after the <br />meet and confer has concluded, City will issue a written statement identifying <br />which portion(s) of the Claim remain in dispute, if any. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.