My WebLink
|
Help
|
About
|
Sign Out
ITEM 16 ATT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
ITEM 16 ATT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:19:10 PM
Creation date
8/6/2025 9:47:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- West Las Positas Boulevard and Foothill Road intersection: Work at this intersection <br />is restricted to one curb ramp for replacement and completion prior to commencement of <br />the work on the other corner. <br />- West Las Positas Boulevard and Lakewood Street intersection: Work at this <br />intersection is restricted to one curb ramp for replacement and completion prior to <br />commencement of work on the other corner. <br />- West Las Positas Boulevard and Muirwood Drive intersection: Work at this <br />intersection is restricted to 1) Two curb ramps on the south side of Muirwood Drive are <br />allowed for work at the same time, 2) Only one intersection corner, either northwest or <br />northeast of intersection corner, is allowed for replacement of curb ramp and completion <br />prior to commencement the work on other corners. <br />- Gibraltar Drive and Chabot Drive: Two curb ramps either on the North side or on South <br />side of Gibraltar Drive are allowed for replacement and completion at the same time. <br />- Gibraltar Drive and Willow Road: Two curb ramps either on the North side or on South <br />side of Gibraltar Drive are allowed for replacement and completion at the same time. <br />2-05 Pae <br />Add: <br />Payment for traffic control for this project shall also include Pedestrian Access Plans. <br />SECTION 3. CLEARING AND GRUBBING <br />3-04 Measurement <br />Revise: <br />Clearing and grubbing shall not be a measured item of work. <br />3-05 Payment <br />Revise: <br />Payment for clearing and grubbing shall be considered included in the various contract <br />items of work and no separate payment shall be allowed. <br />SECTION 7. AGGREGATE BASE <br />7-05 Pae <br />Payment for aggregate base material used for this project shall be considered included in <br />the various contract items of work and no separate payment shall be allowed. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.