My WebLink
|
Help
|
About
|
Sign Out
ITEM 16 ATT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
ITEM 16 ATT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:19:10 PM
Creation date
8/6/2025 9:47:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the potential enlargement of the side areas up to the nearest control joints and all other <br />associated work. <br />The contract price for Remove and Replace (R/R) Case " " (all case) with Blended <br />Transition ADA Ramp shall include full compensation for all work shown on project <br />plans and these Special Provisions including but not limited to the front curb and gutter, <br />pavement conform with HMA (1 foot slot- cut or as shown on the plans), removal and <br />resetting brick pavers, the ADA domes (regardless of width), the retaining curb(s) at the <br />back, restoration, adjust utility box to grade, moving signs and the potential enlargement <br />of the side areas up to the nearest control joints and all other associated work. <br />The contract price for Remove and Replace (R/R) Case " " (all case) with Oversize (OS) <br />Blended Transition ADA Ramp shall include full compensation for all work shown on <br />project plans and these Special Provisions including but not limited to the front curb and <br />gutter, pavement conform with HMA (1 foot slot- cut or as shown on the plans), removal <br />and resetting brick pavers, the ADA domes (regardless of width), the retaining curb(s) at <br />the back, restoration, adjust utility box to grade, moving signs and the potential <br />enlargement of the side areas up to the nearest control joints and all other associated <br />work. <br />Removing and replacing vertical curb up to 8 inches on W. Las Positas Boulevard. and <br />Gibraltar Drive shall not be a measured pay item. <br />Pouring new concrete to the bottom of the existing base of the traffic signal and/or <br />streetlight with expansion joint around pole foundation; shall be considered in sidewalk, <br />ramp, or related passageway island bid item and no separate payment shall be allowed. <br />All existing utilities that are damaged during construction shall be completely restored to <br />the satisfaction of the City Engineer, all at contractor's sole expense. <br />Full compensation for all the median island work on W. Las Positas Blvd. per project <br />documents, shall be considered in the lump sum bid price, complete in place and no other <br />separate payment shall be allowed. <br />Full compensation for the intersection improvements on West Las Positas Boulevard and <br />Foothill Road shall include all work shown on project plans and these Special Provisions <br />including, but not limited to, remove and replace approximately 137 linear feet of curb <br />and gutter, 403 square feet of sidewalk, 2 ADA ramps with domes (regardless of width), <br />installation of cobble stones/paving, pavement conform with HMA (as shown on the <br />plans), the retaining curb(s) at the back or side, soil, expansion materials, restoration, <br />adjust utility box to grade, shall be considered in the lump sum bid price, complete in <br />place and no other separate payment shall be allowed. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.