Laserfiche WebLink
City of Pleasanton <br />30 April 2025 <br />Page 2 <br />Subtask 1.1 – Project Management <br />This task includes coordination and communication with City staff and general consultation and technical <br />project management services, including the preparation of invoices and progress reports. EKI anticipates <br />holding regular check-in meetings with City staff throughout the duration of the project and will also <br />prepare and maintain a detailed project schedule that will include: <br />•A timeline for City staff to submit data described in Task 2; and <br />•A detailed timeline for the preparation of the UWMP, including project milestones. <br />Subtask 1.2 – Kickoff Meeting <br />EKI will schedule, prepare for, and attend a one-hour virtual kick-off meeting with City staff. As part of the <br />kickoff and data needs meeting, EKI will: <br />•Introduce key members of the project team and summarize communication protocols; <br />•Review the project scope and schedule, including project milestones and coordination of related <br />efforts (e.g., anticipated timeframe for California Department of Water Resources’ [DWR] 2025 <br />UWMP Guidebook, City planning efforts, Zone 7’s wholesale UWMP); and <br />•Summarize UWMP requirements and initial data needs (see Task 2). <br />At the kickoff meeting, EKI and City staff will also discuss project goals, opportunities, constraints, <br />roles/responsibilities, and expectations. <br />Subtask 1.3 – Draft Notice of UWMP Preparation <br />EKI will work with the City to identify individuals or entities within the service area to solicit input from <br />during the preparation of the UWMP. EKI will draft template coordination letters and notices required by <br />CWC §10621(b), §10620(d)(2), §10642, and Government Code §6066. These template documents will be <br />provided to the City, and the City will be responsible for distributing the final letters and notices as <br />appropriate. <br />Subtask 1.4 – Coordination with Zone 7 <br />EKI will coordinate with Zone 7 throughout the development of the 2025 UWMP on matters such as the <br />projected availability of future water supplies through 2050; obtaining consistent language for the <br />drought risk assessment to evaluate water supply reliability during a drought lasting five consecutive <br />years; growth projections; and other relevant sections. EKI will also work with the City to involve Zone 7 <br />in the 2025 UWMP update process as required (e.g., receipt of the final adopted 2025 UWMP). <br />Subtask 1.5 – Presentations to Staff <br />EKI will summarize and present key UWMP results to the City’s staff in three working meetings, covering: <br />•Contents of Subtasks 3.1 through 3.3 (e.g., water system description and water use); <br />•Contents of Subtasks 3.4 through 3.8 (e.g., water supply, reliability assessment, demand <br />management measures, water shortage contingency plan); and <br />•Coincident with the Administrative Draft (Subtask 4.2). <br />EXHIBIT A <br />Docusign Envelope ID: C661CF75-4987-4828-A8C7-DB4BC31D3C52