My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 3:52:54 PM
Creation date
8/12/2025 3:47:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P25-0192, Industrial Zoning Text Amendments Planning Commission <br />8 of 14 <br /> <br />• At odds with zoning intent for otherwise permitted uses: If the City has already <br />determined a use should be permitted by-right, then the zoning approval should be <br />“ministerial”, and any related approvals should be able to be processed in a <br />streamlined manner as possible. By requiring the applicant to go through an <br />extensive and discretionary Design Review process when the underlying use is <br />otherwise permitted, it undermines the original intent of some uses being allowed to <br />be approved easily and automatically. The existing Design Review requirements are <br />broad and extensive for commercial uses, requiring Design Review for even very <br />minor or inconsequential exterior changes (e.g., a building color change). <br /> <br />• Adding cost, time, and uncertainty to the applicant’s process: By making an <br />otherwise permitted use subject to Design Review, the applicant will incur additional <br />costs and be required to wait several additional months to go through Design <br />Review. In addition, the process becomes discretionary, which adds uncertainty for <br />the applicant. For example, the applicant may not have a clear idea of what type of <br />architectural design will be acceptable to the City, and they may need to redesign <br />their exterior to pass Design Review, thus adding further time and expense. All these <br />factors create an obstacle that can deter businesses from locating in Pleasanton. <br /> <br />While both factors are important to address, it is recognized the Design Review process <br />can help ensure projects are well designed, functional, and address site-specific <br />adjacencies; therefore, design review will remain appropriate in some situations (for <br />example, construction of a brand-new building or a substantial addition or modification to <br />an existing building). However, the level of such review (administrative vs. Planning <br />Commission level) and the circumstances under which it is required should be carefully <br />considered to avoid creating unnecessary burdens for new, desired business investment. <br /> <br />Accordingly, the proposed Industrial Zoning updates would modify PMC Section 18.20 so <br />all permitted uses, that would occupy new construction or require significant additions, or <br />other more substantial modifications to existing buildings and sites, for permitted IBBs in <br />the Industrial Zoning districts would be subject to Design Review, generally at the Zoning <br />Administrator level, unless referred to the Planning Commission as allowed for by Chapter <br />18.20. Staff notes the PMC includes key performance standards and development <br />standards, as well as various regulations around aspects such as parking, loading, <br />landscaping, and circulation, with which all IBBs would be required to comply. <br /> <br />4. Adjustment to development standards for IBBs and zones where IBB is permitted or <br />conditionally permitted: <br /> <br />As described above, the Planning Commission requested maps and diagrams identifying <br />the areas/sensitive receptors of Pleasanton that could be impacted by the proposed IBB <br />framework to help evaluate whether IBB zoning is suitable across all identified areas, or if <br />limitations should be applied based on context, location, compatibility with existing <br />development, etc. Those maps and diagrams are available in Exhibit C. To mitigate <br />potential land use conflicts and preserve neighborhood character, the limitations being <br />considered by the Planning Commission include additional setbacks or transitional buffers, <br />particularly in locations adjacent to existing residential zones, existing residential <br />development, and/or other existing sensitive receptors. Additionally, the Planning <br />Page 73 of 674
The URL can be used to link to this page
Your browser does not support the video tag.