My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Tassano January 31, 2025 <br />Page 23 of 37 <br />without the extension. This scenario includes all four development projects (Kiewit, Arroyo <br />Lago, Senior Residential, and Amazon). <br />• Alternative 4 – Approved (Near-term) Plus Extension Conditions – Projected land use and <br />future roadway improvements based on the City of Pleasanton Model under approved <br />conditions, with the extension. This scenario includes all four development projects <br />(Kiewit, Arroyo Lago, Senior Residential, and Amazon). <br />• Alternative 5 – Approved (Near-term) Plus Extension Conditions – Projected land use and <br />future roadway improvements based on the City of Pleasanton Model under approved <br />conditions, with a partial buildout of the extension. This scenario includes an extension of <br />El Charro Road between Stoneridge Drive and Busch Road (i.e., not to Stanley Boulevard), <br />as well as all four development projects. <br />• Alternative 6 – Approved (Near-term) Plus Project Conditions – Projected land use and <br />future roadway improvements based on the City of Pleasanton Model under approved <br />conditions, with a full El Charro Extension (Stoneridge to Stanley) with only one lane in <br />each direction (i.e., rather than two lanes in each direction). All four development projects <br />are included in this scenario. <br />The intersections assessed in the sensitivity analysis are a subset of the previously evaluated <br />intersections and have been renumbered in this section for simplicity purposes: <br />1. Santa Rita Road at Stoneridge Drive <br />2. Santa Rita Road at Valley Avenue <br />3. Bernal Avenue/Valley Avenue at Stanley Boulevard <br />4. El Charro Road at Stanley Boulevard <br />5. El Charro Road at Stoneridge Boulevard <br />6. Busch Road at Valley Avenue <br />7. Busch Road at El Charro Road <br />Intersection operations during the weekday morning (7:00 to 9:00 AM) and weekday evening <br />(4:00 to 6:00 PM) peak periods and travel times along the three main routes affected by the <br />extension were determined using estimated traffic volumes. As noted previously, all intersections <br />in this analysis are signalized intersections, and where possible signal timings were optimized to <br />better accommodate the estimated volumes. <br />For the purposes of this sensitivity assessment, scenarios that assume the El Charro Road <br />extension also assume Busch Road is extended to El Charro Road: for these scenarios, Busch Road <br />is assumed to be one lane in each direction.
The URL can be used to link to this page
Your browser does not support the video tag.