My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Tassano January 31, 2025 <br />Page 24 of 37 <br />Intersection Operations <br />Approved Conditions <br />These scenarios include project land use and future roadway improvements under approved <br />conditions but do not include any of the four specific development projects under consideration. <br />These land use conditions have been assessed without and with the El Charro Road extension as <br />proposed (two lanes in each direction). <br />Table 5 presents intersection analysis results for both scenarios. <br />Table 5: Approved Conditions Level of Service Summary <br />Intersection Peak Hour No Extension Plus Extension <br />Delay LOS Delay LOS <br />1 Santa Rita Road/Stoneridge Drive AM PM <br />57 E 58 E <br />42 D 30 C <br />2 Santa Rita Road/Valley Avenue AM PM <br />54 D 41 D <br />58 E 54 D <br />3 Bernal Avenue-Valley <br />Avenue/Stanley Boulevard <br />AM <br />PM <br />47 D 44 D <br />34 C 36 D <br />4 El Charro Road/Stanley <br />Boulevard <br />AM <br />PM <br />- - 25 C <br />- - 18 B <br />5 El Charro Road/Stoneridge Boulevard AM PM <br />39 D 34 C <br />28 C 46 D <br />6 Busch Road/Valley Avenue AM PM <br />30 C 19 B <br />11 B 22 C <br />7 Busch Road/El Charro Road AM <br />PM <br />- - 8 A <br />- - 9 A <br />Notes: <br />1. All intersections are signalized. 2. LOS E and F are shown in bold. Source: Fehr & Peers, January 2025. <br />These results are consistent with results shown in Table 3, and demonstrate that the extension <br />improves intersection operations at intersection 2 (Santa Rita Road/Valley Avenue) while <br />intersection 1 (Santa Rita Road/Stoneridge Drive) operates at LOS E during the AM peak hour. <br />Approved Alternative 1 Conditions <br />These scenarios include projected land use and future roadway improvements under approved <br />conditions with the addition of the first development project under consideration, Kiewit. These
The URL can be used to link to this page
Your browser does not support the video tag.