My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Tassano January 31, 2025 <br />Page 25 of 37 <br />land use conditions have been assessed with and without the El Charro Road extension as <br />proposed (two lanes in each direction). <br />Table 6 presents intersection analysis results for both scenarios. <br />Table 6: Approved Alternative 1 Conditions Level of Service Summary <br />Intersection <br />Peak Hour <br />Approved Conditions Alternative 1 <br />No Extension Plus Extension No Extension Plus Extension <br /> Delay LOS Delay LOS Delay LOS Delay LOS <br />1 Santa Rita <br />Road/Stoneridge Drive <br />AM <br />PM <br />57 E 58 E 60 E 59 E <br />42 D 30 C 43 D 30 C <br />2 Santa Rita Road/Valley Avenue AM PM <br />54 D 41 D 61 E 46 D <br />58 E 54 D 66 E 56 E <br />3 Bernal Avenue-Valley Avenue/Stanley Boulevard <br />AM PM <br />47 D 44 D 48 D 44 D <br />34 C 36 D 34 C 40 D <br />4 El Charro Road/Stanley <br />Boulevard <br />AM <br />PM <br />- - 25 C - - 28 C <br />- - 18 B - - 18 B <br />5 El Charro Road/Stoneridge Boulevard <br />AM PM <br />39 D 34 C 39 D 39 D <br />28 C 46 D 28 C 48 D <br />6 Busch Road/Valley Avenue AM PM <br />30 C 19 B 32 C 21 C <br />11 B 22 C 17 B 31 C <br />7 Busch Road/El Charro <br />Road <br />AM <br />PM <br />- - 8 A - - 9 A <br />- - 9 A - - 10 A <br />Notes: <br />1. All intersections are signalized. 2. LOS E and F are shown in bold. Source: Fehr & Peers, January 2025. <br />Traffic associated with the Kiewit project deteriorates intersection operations at both intersection <br />1 (Santa Rita Road/Stoneridge Drive) and 2 (Santa Rita Road/Valley Avenue). The extension does <br />not improve operations to LOS D or better, but it does decrease the average delay at Santa Rita <br />Road/Valley Avenue by 13 seconds in the AM peak hour. Overall, the inclusion of the Kiewit <br />project increases the average delay across study intersections by approximately three seconds <br />per intersection. <br />Approved Alternative 2 Conditions <br />These scenarios include projected land use and future roadway improvements under approved <br />conditions with the addition of the first and second development projects under consideration,
The URL can be used to link to this page
Your browser does not support the video tag.