Laserfiche WebLink
Traffic Signal Maintenance Contract Contract No.______ <br />Scope of Work Page 8 <br /> <br /> <br />5.3 Pending Repair List <br />The Contractor shall provide a computerized monthly report, to the City Traffic Engineering <br />Division of the Community Development Department by the fifteenth day of each month, of all <br />pending repair work needed at each intersection. This report shall be broken down by intersection <br />and be separate from the Monthly Activity Report. <br /> <br />If the contractor does not provide the computerized monthly activity report by the fifteenth day, the <br />Contractor shall pay liquidated damages to the City in the amount of $500 per calendar day until the <br />report is submitted. <br /> <br />Section 6. MEETINGS <br />The Contractor's technician shall be available to meet with the City Traffic Engineering Division on <br />a weekly basis at a mutually agreed upon time and place in the City of Pleasanton to review each <br />week's maintenance activities. The Contractor's maintenance supervisor shall be similarly available <br />to meet with the City Traffic Engineering Division on a monthly basis. <br /> <br />Section 7. KEY PERSONNEL <br />Any and all persons identified in this Agreement performing work hereunder are deemed by CITY to <br />be key personnel whose services were a material inducement to CITY to enter into this Agreement, <br />and without whose services CITY would not have entered into this Agreement. CONTRACTOR <br />shall not remove, replace, substitute, or otherwise change any key personnel without the prior written <br />consent of CITY. <br /> <br />Section 8. COMPENSATION <br /> <br />8.1 Compensation for Routine Maintenance <br />In consideration of the furnishing by the Contractor of the described labor, services, materials and <br />equipment in accordance with all provisions of this Agreement, together with the appurtenances <br />thereto, said Contractor shall be paid by the City per maintained intersection and per maintained <br />beacon / in-pavement lights per month as the flat rate cost in accordance with Section 13 – Cost <br />Proposal, attached and incorporated by reference as though fully set forth herein. <br /> <br />In the event that new traffic signals are installed, the Contractor agrees to maintain these signals at <br />the same flat rate and in the same manner as those covered by this Agreement upon written <br />notification from the City Traffic Engineering Division. In the event a notification is made at other <br />than the beginning of the monthly contract period, payment for that month shall be prorated on a <br />daily basis. <br /> <br />The flat rate maintenance cost does not include new traffic signal poles, pedestrian push buttons, <br />LED indications, traffic signal cabinet installation, service cabinet installation, testing traffic signal <br />controller cabinets, installing video detection cameras and CCTV PTZ cameras, painting of poles, <br />heads, cabinets or other devices, nor the repair or replacement cost of inductive loops, signs, <br />electroliers, radar speed signs not associated with traffic signal operations, or repairs to signal <br />Docusign Envelope ID: 3B82A602-152E-44CD-836A-6603E8712601