My WebLink
|
Help
|
About
|
Sign Out
ST. FRANCIS ELECTRIC (#2025586)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
S
>
ST. FRANCIS ELECTRIC (#2025586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 4:08:49 PM
Creation date
8/18/2025 4:05:19 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
ST. FRANCIS ELECTRIC, LLC
Contract Record Series
704-05
Munis Contract #
2025586
Contract Expiration
6/30/2027
NOTES
CONTRACTOR PROVIDING TRAFFIC SIGNAL MAINTENANCE SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Signal Maintenance Contract Contract No.______ <br />Scope of Work Page 9 <br /> <br />equipment when such equipment has been damaged by vehicular collisions, acts of God, or <br />malicious damage. All other work and repair required to maintain a fully operational traffic signal <br />shall be considered to be included as part of the routine maintenance. <br /> <br />The maintenance of or replacement of inductive loop sensor units and amplifier units, load switches <br />and other minor control components are included in the flat rate maintenance cost. <br /> <br />After hour, weekend and holiday calls shall be included in the flat rate maintenance cost, except in <br />cases where necessary repair work results from vehicular collisions, acts of God, or malicious <br />damage. Request for payment of this work shall be submitted to the City on a separate invoice. <br /> <br />It is the intent of this contract to contain all maintenance and repair costs within the monthly flat rate, <br />with the exception of repair work resulting from vehicular collisions, acts of God, or malicious <br />damage. <br /> <br />8.2 Compensation for Extra Work <br />The City shall pay for repairs under extra work when such repairs are made necessary due to damage <br />to signals resulting from vehicular collisions, act of God, or malicious damage. <br /> <br />The City agrees to pay the Contractor the full amount of extra repairs in accordance with Section 13 <br />Bid Items and Additional Bid items. The first two hours of Extra Work in response to calls for <br />service received by Contractor between 7 AM and 4 PM on weekdays (non-holidays) shall be <br />charged at the straight time rate (not overtime). <br /> <br />The Contractor shall contact the City Traffic Engineering Division to obtain prior approval before <br />work is scheduled. The Contractor shall verify invoiced charges, when requested by City, with time <br />cards and material invoices. <br /> <br />Repair or replacement of in-pavement loop vehicle detectors shall be considered extra work and <br />shall require approval from the City Traffic Engineering Division prior to replacement. <br /> <br />Repair or replacement of equipment related to radar speed signs shall be considered extra work and <br />shall require approval from the City Traffic Engineering Division prior to repair replacement. <br />Payment shall be made on a time and materials basis. <br /> <br />MATERIAL ONLY required for the replacement of burned out, flickering, dim or otherwise non- <br />functioning LED or incandescent vehicle and pedestrian signals shall be considered extra work. <br /> <br />Section 9. CONTRACT TERM <br />The period of this Agreement for Contract Services shall extend from July 1, 2025 thru June 30, <br />2027. <br /> <br />If the Agreement is extended beyond June 30, 2027 per Section 1 of the Maintenance Services <br />Agreement, the Contractor may request an adjustment of the flat rate, labor, and Equipment costs <br />Docusign Envelope ID: 3B82A602-152E-44CD-836A-6603E8712601
The URL can be used to link to this page
Your browser does not support the video tag.