My WebLink
|
Help
|
About
|
Sign Out
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
B
>
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:36:57 AM
Creation date
10/3/2025 11:33:51 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT "BART"
Contract Record Series
704-05
Contract Expiration
10/2/2025
Document Relationships
RES 2025037-1
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.Opportunities and Constraints Mapping: Working alongside BART and other key <br />stakeholders, develop an initial assessment of site opportunities and constraints based on <br />existing conditions and constrains evaluation and background information. This <br />document will outline the site's potential, showcasing both development opportunities <br />and challenges. It will serve as a tool to introduce the site to the community, emphasizing <br />the anticipated benefits for the local area and presenting high-level possibilities for future <br />development. The materials produced in this task may be utilized by City staff for initial <br />stakeholder or elected official engagement. <br />Deliverables: <br />3.1 Existing Physical Site Conditions Opportunities and Constraints Evaluation (Draft) <br />a.Title Reports (provided by BART or the City) <br />b. Flood Zone Review* <br />c.Existing Utilities Map* <br />d.Basis of Design Criteria memo (provided by BART) <br />*Unless determined unnecessary based on existing analysis identified in Task 1. <br />3.2 Existing Physical Site Conditions Opportunities and Constraints Evaluation (Final) <br />3.3 Consolidated Stakeholder Notes <br />3.4 Prelim. Market Assessment Results Meeting <br />3.5 Station Access and Parking Management Study <br />3.6 Opportunities and Constraints Mapping <br />Task 4: Site Reuse Options + Draft Goals and Objectives <br />A.Draft Re-Use Options: Draft 2-3 options for site reuse identifying conceptual blocks, a <br />circulation framework, public and private open spaces, BART station access, vehicular <br />and bicycle parking and associated multi-modal transportation improvements. The <br />options will also define a generalized development program that includes a range of land <br />uses including residential development and complementary non-residential uses, <br />informed by existing BART and City requirements and by the market study. <br />B.Final Options Memorandum: Memorandum intended for community and elected official <br />engagement highlighting site reuse options, visually depicting reuse concepts through <br />photographs, case studies, and diagrams. <br />C.Draft Goals and Objectives: Facilitate a collaborative process between the City and <br />BART to establish a draft set of Goals and Objectives for the site, focusing on community <br />input, station access, potential land use mix, livability, and environmental sustainability. <br />A draft produced by the consultant will be finalized by the City and BART for approval <br />as part of Task 6, and will be integrated into MOU#2 (Task 6F). <br />Deliverables: <br />4.1 Draft and Final Site Re-Use Options Memorandum <br />4.2 Draft Goals and Objectives Summary Paper <br />Page 19 of 21 <br />Docusign Envelope ID: 094A4C1A-13D7-44EA-BE42-B0F1E0142890Docusign Envelope ID: 663B3163-E73A-4E80-A759-F92FA9FC8D9D
The URL can be used to link to this page
Your browser does not support the video tag.