My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
091625 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:30:34 PM
Creation date
10/10/2025 3:15:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2025
DESTRUCT DATE
15Y
DOCUMENT NO
REGULAR MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br />that is no longer in a serviceable condition and requires replacement of the panels, alarms, <br />horns and other associated equipment with relocation of devices to meet current standards. <br /> <br />The OSC Fire Alarm & Notification System project, CIP No. 23457, was approved to retrofit the <br />existing fire alarm control system and add a site-wide communication system to enhance the <br />City's response to emergencies. In June 2025, CIP No. 23457 was re-approved, and the <br />Library Fire Alarm Upgrade project, CIP No. 26386, was approved as part of the fiscal year <br />(FY) 2025/26 – FY 2029/30 Capital Improvement Program. The Library services the entire <br />Pleasanton community and also serves as a community cooling center. The fire alarm system <br />was identified in 2022 as needing to be upgraded due to the system’s age and lack of <br />monitoring of the fire sprinklers. In addition, the exterior backflow is underground and needs to <br />be replaced with an above-ground backflow assembly to meet current standards. <br /> <br />Staff reviewed the scopes of work needed to retrofit both fire alarm systems and prepared a <br />single Request for Proposals (RFP) that incorporates the design and work for both locations. In <br />an effort to reduce costs and increase efficiencies, the Corporation Yard Livermore-Pleasanton <br />Fire Department (OSC-LPFD) buildings and the Pleasanton Police Station were also added to <br />the RFP scope of work. <br /> <br />The RFP was published June 13, 2025, with two scheduled pre-bid meetings. Only one <br />responsive proposal was received by the deadline on July 16, 2025, so the City re-bid the <br />RFP. The re-bid RFP was published August 2, 2025, with an additional pre-bid meeting <br />scheduled. Four proposals were received on August 20, 2025. <br /> <br />DISCUSSION <br />The Fire Alarm Retrofit Project provides a turnkey solution for upgrading obsolete fire alarm <br />systems at three City campuses (12 buildings and approximately 140,000 square feet). The <br />project includes investigation, design, shop drawings, permits, installation, and testing <br />services. Due to the specialized systems and the requirement for shop drawings, no traditional <br />design documents were prepared. Instead, original building plans were provided to the design <br />and construction team to develop fire alarm shop drawings for permitting and review. <br /> <br />City Corporation Yard (OSC) – 3333 Busch Road <br />The Operations Service Center (OSC), constructed in 1991, consists of eight buildings totaling <br />approximately 86,600 square feet. These buildings house the Public Works Department’s <br />Operations & Maintenance and Utilities and Environmental Services Divisions, and the <br />Pleasanton Police Department’s training and storage functions (OSC-PD). The campus is <br />served by a zoned fire alarm system with a non-functioning control panel. Although the <br />buildings are fully sprinklered, this system does not monitor all of the exterior fire risers. <br /> <br />The scope of work at this location includes: <br />• Relocating the fire alarm control panel (FACP) <br />• Upgrading to an addressable fire alarm system with remote monitoring <br />• Adding a one-way voice communication system throughout offices, shops, and exterior <br />Page 117 of 264
The URL can be used to link to this page
Your browser does not support the video tag.