Laserfiche WebLink
Page 3 of 5 <br />areas to enhance emergency response <br /> <br />Two additional OSC buildings, the LPFD Training Center and a one-story classroom <br />(approximately 2,500 square feet, built in 1988), are not sprinklered and are connected to a <br />separate unmonitored fire alarm system that also controls the training tower used for live-burn <br />activities. The scope includes a new addressable system and FACP with remote monitoring, <br />separated from the training tower system, which will remain in place. <br /> <br />Staging of materials, waste bins, and contractor parking will be inside the OSC gates near <br />Busch Road, away from neighboring properties. Exterior work will follow city ordinance hours. <br />Limited disruption is expected to staff, with no impact to community services. The training <br />tower, miscellaneous site structures, emergency generator, and fuel tanks are not part of this <br />project. <br /> <br />City Library – 400 Old Bernal Avenue <br />The Library, constructed in 1988 and remodeled in 2019, is the City’s largest building at <br />approximately 30,200 square feet. It is sprinklered and currently served by an outdated, zoned <br />fire alarm system with remote monitoring. <br /> <br />The scope of work at this location includes: <br />• Relocating the FACP and upgrading to an addressable system <br />• Adding devices to meet current code <br />• Replacing the underground backflow assembly with a new above-grade assembly <br /> <br />Adding fire alarm monitoring for the backflow and fire riser to minimize public impact, interior <br />work will occur outside public hours, and the Library will remain open during regular hours. <br />Impacts to staff will be minimal. Exterior work will follow city ordinance hours. Staging will be <br />secured within contractor-provided fencing, and a fire watch will be required when systems are <br />offline. The adjacent library storage building is not included in this scope. <br /> <br />Pleasanton Police Station – 4833 Bernal Avenue <br />The Police Station building, constructed in 1983 with additions in 1997, is approximately <br />20,300 square feet. It includes an elevator, fire sprinklers, and an original fire alarm system <br />monitored by Police Dispatch. <br /> <br />The scope of work at this location includes: <br />• Upgrading to an addressable fire alarm system <br />• Providing remote monitoring of the FACP <br />• Installing new elevator fire alarm devices <br />Page 118 of 264